My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0819_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0819_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2013 2:07:43 PM
Creation date
8/15/2013 3:49:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Bryan Lloyd <br />From:Dolores Merrill > <br />Sent:Wednesday, August 07, 2013 1:09 PM <br />To:Bryan Lloyd <br />Subject:Request for interim building on Corpus Christi church property <br />i oppose granting this permit because of the drainage problem that has existed the entire 15 years I have lived at 1833 <br />Eldridge Ave. The south side of the church property drains to a swale, flowing to a drain at the NE corner of my lot, <br />which is entirely inadequate for the q uantity of water . In a heavy rain the swale becomes a river, swirling and backing up <br />10 ‐15 feet onto my lot and the lot to the East, carrying debris with it. Because of improper grading, the swale seldom <br />dries up, leaving standing water, a breeding ground for mosquitos carrying West Nil e virus. Tall weeds grow in the swale <br />and are seldom cut. <br /> <br />Despite repeated complaints to the City of Roseville, nothing has been done to address the problem. A Roseville <br />Fairview Area Drainage April 6, 2012 letter, discussed regrading the swale and building a rate control pond on church <br />property North of my lot. At a City Hall meeting Ap ri l 24, 2012 it was stated this could be done as soon as a similar pond <br />was built SW of the Skillman cul de sac. That was completed in fall 2012, but nothing has been done for the Eldridge <br />situation. <br /> <br />There are other reasons to oppose the temporary building, such as the fact that it bri ngs the school closer to the <br />residents, its appearance, the fact that the students scatter "junk" around the property, groups of unsupervised students <br />roam the area, there are other underutilized buildings available, other available locations within the churc h proper ty, <br />etc. <br /> <br />However, for me the overriding issue is drainage. I feel it would be completely irresponsible of the city and the church <br />to do anything to increase runoff until the existing drainage problem is fixed. <br /> <br />Dolores Merrill <br />1833 Eldridge Ave W. <br />Roseville, MN 55113 <br />Phone <br /> <br /> <br />Attachment D <br />Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.