My WebLink
|
Help
|
About
|
Sign Out
Home
2013-09-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2013
>
2013-09-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2013 3:57:52 PM
Creation date
9/19/2013 3:55:49 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/24/2013
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: September 24, 2013 Item No: 4 <br />Item Description: Communication Items <br />Projects update: <br />• Waterman lining project— The project is nearly complete. We eliminated the Transit <br />Ave. segment due to some limitations of the process which put the return to service same <br />day at risk. <br />• County Road D Reconstruction — The east segment of this project between Chatsworth <br />and Victoria Street is completed to first layer of asphalt. The segment between Lexington <br />and Chatsworth is under construction. The project should be substantially complete by <br />the end of October. <br />• Villa Park Sediment Removal Project— Dredging of the wetland cells is completed. Final <br />hauling and restoration will be completed after the dredge material has dewatered to <br />acceptable levels. <br />• Neel Gas Main Replacement Project- This project is substantially complete. One ped <br />ramp and miscellaneous restoration is yet to be done. Maplewood and Ramsey County <br />are anticipating revisions to the temporary trail on the east side to bring it into <br />compliance with ADA requirements. <br />• Utility Extension at 3040 Hamline Avenue - This project will be complete very soon with <br />placement of the driveway gravel. <br />• County Road B -2 Pathway Construction- Staff continues to work on plans for this <br />pro <br />j . ect. A public comment opportunity will occur at City Council meeting on October <br />14r <br />• Staff is also working on the following projects: <br />• Wheeler Avenue Traffic Management Project <br />• McCarrons Lake Sub watershed Drainage Improvements <br />• 2014 preliminary surveys for pavement projects. <br />Maintenance Activity: <br />• Streets Crews are continuing pavement maintenance and preparations for the leaf <br />collection program and finishing pathway maintenance projects. <br />• Utility crews continue performing annual sanitary sewer cleaning and fall hydrant and <br />valve maintenance. <br />Attachments: <br />A. None <br />
The URL can be used to link to this page
Your browser does not support the video tag.