Laserfiche WebLink
Pathway Master Buildout Plan <br />Estimated Cost <br />Length <br />Funding <br />Traffic <br />Score <br />Description <br />(Miles) <br />Build Year <br />Source <br />Counts <br />Retaining <br />(Scoring per 2008 Pathway Master Plan) <br />On Road <br />Signage <br />Off Road <br />Bridge <br />Striping <br />Drainage <br />wall <br />Total <br />23 <br />Langton Lake Loop <br />72.5 <br />Pathway that goes around all of Langton Lake <br />Future <br />NA <br />23 <br />On Road <br />0.4 <br />$1,000 <br />1 <br />$840 <br />$1,840 <br />On and off road facilities as a part of public street <br />infrastructure project within Twin Lakes <br />Developer/ <br />24 <br />Twin Lakes Redevelopment Area Connections <br />56.75 <br />Redevelopment area (between Fairview and <br />no estimate- will be constructed as a part of development <br />Future <br />TIF /Assess <br />NA <br />Cleveland) Provide connection from the <br />redevelopment area into Langton Lake Park <br />Northeast Diagonal Trail Connection (Walnut <br />County Road C trail connection to the NE <br />25 <br />110 <br />Future <br />14,500 <br />to Co Rd C ) <br />Diagonal Trail into Minneapolis <br />25 <br />O tion 1- along County Road C/ Walnut <br />$343,636 <br />$125,284 <br />$12,633 <br />$481,553 <br />25 <br />10 ft wide bituminous attached pathway south <br />0.55 <br />$263,636 <br />$96,117 <br />$12,633 <br />side County Road C <br />25 <br />East side Walnut 8 ft bituminous <br />0.17 <br />$80,000 <br />$29,167 <br />25 <br />Option 2- Along the Railroad right- of- way <br />8 ft wide bituminous trail along tracks <br />0.87 <br />$348,485 <br />$152,462 <br />$500,947 <br />south of County Road C <br />light ra is overhead ri ge structure across <br />26 <br />Rosedale to HarMar Connection <br />114.5 <br />Highway 36 and pathway connection between <br />1 <br />$370,000 <br />$1,600,000 <br />$175,000 <br />$2,145,000 <br />Future <br />41,000 <br />27 <br />Heinel Drive Connection <br />75.5 <br />Pathway connection between S Owasso Blvd and <br />$1,375 <br />$157,500 <br />$1,155 <br />$61,250 <br />$24,150 <br />$245,430 <br />Future <br />NA <br />County Road C along Heinel Drive <br />27 <br />On Road- Heinel Drive <br />signage and striping along the route <br />0.55 <br />$1,375 <br />$1,155 <br />$2,530 <br />27 <br />Pathway <br />Construct 8 ft wide pathway adjacent to Railroad <br />0.35 <br />$157,500 <br />$61,250 <br />$24,150 <br />$242,900 <br />tracks connecting to Victoria Street <br />28 <br />Judith to Iona Connection <br />72.75 <br />1-athway connection between Judith Ave and Iona <br />0.1 <br />$40,000 <br />$17,500 <br />$5,750 <br />$63,250 <br />Future <br />Harks <br />Renewal <br />NA <br />29 <br />Lovell to Minnesota Connection <br />80.25 <br />Pathway connection between Lovell Ave and <br />0.1 <br />$45,000 <br />$17,500 <br />$6,900 <br />$69,400 <br />Future <br />NA <br />Minnesota Street <br />30 <br />Villa Park Connections <br />88.75 <br />Pathway connection from Shryer Ave and from <br />Not Feasible to construct an ADA compliant pathway without removing significant vegetation <br />Future <br />NA <br />Ran Ave into Villa Park <br />Pathway connection that creates a link between <br />31 <br />Millwood to County Road C2 Link <br />98.5 <br />the corner of Millwood and Chatsworth through <br />0.25 <br />$100,000 <br />$43,750 <br />$11,500 <br />$155,250 <br />2013 -2015 <br />NA <br />the Ramsey County open space to County Road <br />C2 <br />32 <br />Eustis to St Croix Connection <br />49 <br />Pathway connection between Eustis Street and St <br />0.2 <br />$80,000 <br />$13,800 <br />$93,800 <br />Future <br />NA <br />Croix Street <br />33 <br />Cohansey St to HANC Connection <br />89.5 <br />Pathway connection between Cohansey Street <br />Additional Discussion <br />Future <br />NA <br />and HANC <br />Pathway connection along Alta Vista Drive <br />34 <br />Alta Vista Drive <br />94.25 <br />Future <br />Unknown <br />between Lar enteur Avenue and Reservoir <br />34 <br />Option 1: On Road <br />stripe a section of the road and designate for <br />0.45 <br />$1,125 <br />$945 <br />$2,070 <br />pedestrians - would require no parking on the road <br />34 <br />Option 2: Off Road Sidewalk <br />6 ft wide sidewalk on one side of the road <br />0.45 <br />$202,500 <br />$78,750 <br />$31,050 <br />$312,300 <br />4 of 4 8/22/2013 <br />