My WebLink
|
Help
|
About
|
Sign Out
Home
2013-09-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2013
>
2013-09-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2013 3:57:52 PM
Creation date
9/19/2013 3:55:49 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/24/2013
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
80 At the request of Member Gjerdingen, Mr. Schwartz advised that the temporary <br />81 sidewalk and replacement of the handicapped ramps on the segment on the east <br />82 side of Rice Street was a City of Maplewood and Ramsey County discussion; and <br />83 offered to follow -up and report back to the PWETC on their decision with <br />84 Ramsey County and the contractor once a decision had been made if the <br />85 temporary pathway will become permanent. Member DeBenedet noted that once <br />86 the west side segment was reinstalled, it should provide good access. <br />87 <br />88 Regarding the Rice Street gas main project by Xcel, Mr. Schwartz reported that <br />89 the project should wrap up soon, with all pipe installed and pressure tested from <br />90 Roseville to Arlington Avenue in St. Paul; with the only remaining item <br />91 connection of the two pieces of pipe after passing the pressure tests. <br />92 <br />Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.