My WebLink
|
Help
|
About
|
Sign Out
Home
2013-10-01_PR_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2013
>
2013-10-01_PR_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2013 12:04:06 PM
Creation date
10/2/2013 12:01:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROSEVILLE PARKS RENEWAL PROGRAM - NATURAL RESOURCE PROJECTS <br />Park <br />Location within <br />Type <br />Size <br />Est. <br />Type <br />Project cost estimate <br />Funding <br />Maintenance <br />Comments <br />Rank <br />ark <br />Priority <br />AC, SF or LF <br />Habitat <br />water <br />PRRP <br />Grant <br />Other <br />quality <br />Estimated total acres. Includes basic turf -to- native conversion, <br />LEXINGTON <br />Four potential <br />Turf -to- native conversion <br />1 AC <br />X <br />X <br />$5,000 <br />X <br />X <br />N <br />as well as expansion of a pre- existing landscape feature, the <br />locations in park <br />latter of which will be incorporated into a park redevelopment <br />romect Plan & Spec. <br />Rain garden <br />East of parking lot, renovate existing rain garden to improve <br />LEXINGTON <br />Rain garden - Parking lot <br />1 AC <br />Medium <br />X <br />X <br />$5,000 <br />X <br />X <br />N <br />aesthetics (functionality appears to be reasonable ?). To be <br />renovation <br />taken care of as part of park redevelopment (non -NR related) <br />Five potential <br />LEXINGTON <br />locations within <br />park. Four along <br />Rain garden - Street runoff <br />1800 <br />Medium <br />X <br />$50,400.00 <br />X <br />X <br />N <br />Potential CWP grant opportunity. Budget for four rain garden <br />Lexington Ave., and <br />locations within park <br />one on SW side <br />Under open -grown <br />bur oaks, slope on <br />Medium- <br />Treat turf 2x, native seeding, native flower /grass plugs, <br />PIONEER <br />back side of Zuettel <br />Turf -to- native conversion <br />0.25 AC <br />low <br />X <br />$3,500 <br />X <br />N <br />mulch /ESC, two years of grow -in maintenance. <br />Memorial flower <br />gardens <br />SW side of park, <br />Medium - <br />PIONEER <br />along Chatsworth <br />Rain garden - Street runoff <br />250 SF <br />X <br />$9,500.00 <br />X <br />X <br />N <br />Requires drain tile. <br />Avenue <br />low <br />Currently, the St. Paul WaterWorks has crushed concrete <br />RESERVOIR <br />West side of new <br />Native plant community <br />aggregate piles west of their new storage tank. The distrubed <br />WOODS <br />SPWW tank <br />reconstruction <br />2 AC <br />Low <br />X <br />$10,000 <br />X <br />X <br />N <br />area could be reshaped after aggregate is removed, topsoiled <br />and seeded to a native grass and flower seed mix with the <br />long -term goal of prairie, savanna, or native hardwood forest. <br />Potential for interpretive signs that could address forest <br />RESERVOIR <br />Various <br />Interpretive Signage <br />5 ?? <br />? ?? <br />$25,000 <br />N <br />ecology, urban green space, wetland ecology, prairie ecology, <br />WOODS <br />forest ecology or similar. Cost would include design, <br />manufacture and installation. <br />SW corner of <br />RESERVOIR <br />parking lot at Alta <br />Rain garden - Parking lot <br />300SF <br />Medium <br />X <br />$11,400 <br />X <br />X <br />N <br />A rain garden just off the SW side of the parking area would <br />WOODS <br />Vista and Stuber <br />treat runoff from the parking lot and SPWW access road. <br />Dr. <br />ROSEBROOK <br />NE side of North <br />Rain garden - Parking lot <br />450 SF <br />Medium <br />X <br />$17,000 <br />X <br />X <br />N <br />Rain garden with retaining wall and drain tile. <br />parking lot <br />ROSEBROOK <br />SE side of North <br />Rain garden - Parking lot <br />450 SF <br />Medium <br />X <br />$12,600 <br />X <br />X <br />N <br />Rain garden with drain tile. <br />parking lot <br />ROSEBROOK <br />Park building - new <br />Rain garden - Roof <br />450 SF <br />Medium <br />X <br />$12,600 <br />X <br />X <br />N <br />Rain garden(s) to treat roof runoff for new park building. <br />Requires drain tile. <br />Southeast side of <br />Concept plan calls for wildflower walk. Estimated cost is for <br />SANDCASTLE <br />entrance trail off of <br />Turf -to- native conversion <br />0.1 AC <br />Medium <br />X <br />$7,500 <br />X <br />N <br />low maintenance native grass /flower seeding and flower plug <br />Stanbridge Street <br />planting with interpretive sign on trail side of seeding <br />Rain garden off of <br />Concept plan calls for abandoning of existing parking <br />SANDCASTLE <br />Patton Road, near <br />Rain garden - Street runoff <br />450 SF <br />Medium <br />X <br />$12,600 <br />N <br />lot/entrance off of Patton Rd. This area may be suitable for a <br />current parking lot <br />rain garden with a drain tile. <br />entrance <br />
The URL can be used to link to this page
Your browser does not support the video tag.