Laserfiche WebLink
ROSEVILLE PARKS RENEWAL PROGRAM - NATURAL RESOURCE PROJECTS <br />Park <br />Location within <br />Type <br />Size <br />Est. <br />Type <br />Project cost estimate <br />Funding <br />Maintenance <br />Comments <br />Rank <br />ark <br />Priority <br />AC, SF or LF <br />Habitat <br />water <br />PRRP <br />Grant <br />Other <br />ualit <br />CENTRAL PARK <br />CP -U4 <br />Woodland /Forest <br />7.5 <br />Medium <br />X <br />$45,000 <br />X <br />X <br />Y <br />Cut /treat invasives, native seeding, Rx burn, follow -up treat <br />1 <br />DALE EAST <br />Restoration <br />invasive brush <br />CENTRAL PARK <br />Educational /interpretive prairie at HANC. Area needs <br />CP -U5 <br />Prairie Reconstruction <br />0.3 AC <br />High <br />X <br />$4,000 <br />X <br />Y <br />supplemental seeding, plug planting, Rx burns for 2 years in a <br />1 <br />DALE EAST <br />row and spot invasive weed treatment for 2 years. <br />CENTRAL PARK <br />HANC Prairie/ <br />Interpretive Signage <br />5 ?? <br />? ?? <br />$25,000 <br />Y <br />New interpretive signs for prairie and woodland gardens? Is <br />1 <br />DALE EAST <br />Woodland plantings <br />this covered in other areas ? ?? <br />Cost varies, depending on the level of study necessary for <br />study /implementation of hydrologic (water level) restoration. <br />Hydrologic restoration should occur before /simultaneously with <br />CENTRAL PARK <br />vegetative restoration and management of excessive nutrients <br />CP -W1 <br />Wetland Restoration <br />35.5 <br />High <br />X <br />X <br />$125,000 - $200,000 <br />X <br />X <br />Y <br />from the City compost facility. Bioreleases for purple <br />1 <br />DALE EAST <br />loosestrife, fall spray for Reed Canary Grass by aerial <br />application (helicopter w/ microfoil boom ?). This is a high <br />priority site because it is part of the HANC interpretive <br />program ming /facility. <br />Construction of BMPs to stop /mitigate nutrient -rich runoff from <br />CENTRAL PARK <br />compost piles to HANC wetland. Proposed approach include <br />DALE EAST <br />Compost Facility <br />Water quality improvements <br />675 LF, 2 RWG <br />HIGH <br />X <br />$70,000 <br />?? <br />Y <br />diversion /treatment swale and 2 RWG and site clean -up. <br />1 <br />Additional analysis and design to determine if feasible - <br />17 000. <br />Cut /treat invasive, nonnative shrubs (and select <br />CENTRAL PARK <br />Woodland /Forest <br />Medium- <br />nonnative /invasive trees), prescribed burn of select areas, <br />LEXINGTON <br />CP -U1 <br />Restoration <br />2.75 AC <br />high <br />X <br />$20,000 <br />X <br />X <br />Y <br />supplemental native seeding, follow -up treatment of invasives <br />1 <br />for two years. Includes restoration of areas between trails on <br />north side of Bennett Lake. <br />Cut /treat invasive, nonnative shrubs (and select <br />CENTRAL PARK <br />CP -U2 <br />Woodland /Forest <br />2.5 AC <br />Medium- <br />X <br />$6,000/ AC <br />X <br />X <br />Y <br />nonnative /invasive trees), prescribed burn of select areas, <br />1 <br />LEXINGTON <br />Restoration <br />high <br />supplemental native seeding, follow -up treatment of invasives <br />for two years. <br />Treat reed canary grass 2X in select buffer areas accessible <br />CENTRAL PARK <br />Bennett Lake <br />Shoreline restoration <br />.25 AC <br />Medium- <br />X <br />X <br />$10,000 <br />X <br />X <br />Y <br />by equipment, prescribed burn, native seeding, plug planting, <br />1 <br />LEXINGTON <br />Shoreline <br />high <br />goose protection fencing two years of grow -in maintenance. <br />Estimated average 20' width X —600 LF <br />Frog pond buffer <br />Manage existing buffer restoration (cut woody spp., spot treat, <br />CENTRAL PARK <br />management/ <br />Shoreline restoration <br />1 AC <br />Medium- <br />X <br />X <br />$10,000 <br />X <br />X <br />Y <br />prescribed burn, supplemental seeding, and maintenance. <br />1 <br />LEXINGTON <br />high <br />Expand native plantings to the east, convert —.75 ac. of turf -to- <br />expansion <br />natives (spray, spray, seed, 2 years grow -in maintenance) <br />Map and treat curly leaf pondweed for 3 years, apply for MN <br />CENTRAL PARK <br />Medium- <br />DNR AIS treatment grant. THIS EFFORT SHOULD OCCUR <br />LEXINGTON <br />Bennett Lake <br />Lake Restoration <br />28 ac <br />high <br />X <br />X <br />$42,000 <br />X <br />X <br />Y <br />IN CONCERT WITH MANAGING WATER <br />1 <br />QUANTITY /QUALITY WITHIN THE BROADER <br />WATERSHED. Total lake area — 28 AC <br />CENTRAL PARK <br />Medium- <br />Coordinate potential stocking with /by MN DNR to reduce <br />LEXINGTON <br />Bennett Lake <br />Stock piscivorous fish <br />Lake <br />high <br />$0 <br />Y <br />number of small fish that feed on zooplankton. Fish may also <br />1 <br />be purchased and released from private hatchery with permit. <br />