Laserfiche WebLink
Parks and Recreation Renewal Program <br />Roseville, Minnesota <br />PRRP Trails Component <br />Priority and estimated construction costs <br />18- Sep -13 <br />Park <br />Priority <br />Description <br />Trail improvement <br />Strategy <br />bituminous <br />concrete <br />soft <br />linear feet at 8' wide <br />linear feet at <br />6' wide <br />linear feet <br />at 10' wide <br />B -2 <br />1 <br />Highest ranking through public process <br />Pocahontas <br />2 <br />safety along road, internal loop <br />560 <br />Correcting a safety issue <br />Howard Johnson <br />3 <br />accessible connection to play area and tennis court <br />230 <br />Accessibility <br />Langton Lake <br />4 <br />C2 play area access <br />160 <br />Accessibility <br />Villa <br />5 <br />access to Upper Villa play area <br />Accessibility <br />Mapleview <br />6 <br />internal path, maintenance to rink, curb cut to accommodate strollers <br />1200 <br />Curb cut and path to play area needed for access to play area <br />Lexington <br />7 <br />complete Lexington to building, Eldridge loop <br />890 <br />Complete existing pathway loop /potential safety issue /access to new structure <br />Rosebrook <br />8 <br />complete loop at north end <br />320 <br />Complete existing pathway loop <br />Autumn Grove <br />9 <br />internal spine and park loop <br />1920 <br />Complete loop /recreation amenity /complete park area <br />Acorn <br />10 <br />trike path, connection to Western along Brooks <br />190 <br />Recreational <br />Tamarack <br />11 <br />play area access <br />1380 <br />Accessibility, park plan needs to be approved <br />Evergreen <br />12 <br />neighborhood link to east, through natural area <br />Connectivity, SW plan must be completed <br />Oasis <br />13 <br />soft trail at pond <br />300 <br />1200 <br />Recreational /high priorty for neighbors <br />Materion <br />14 <br />link to Hand cul -de -sac to Grandview cul -de -sac <br />280 <br />Connection to neighborhoods <br />Villa <br />15 <br />parallel Cohansey and wetland, another bridge crossing <br />510 <br />710 <br />Recreational <br />Bruce Russell <br />16 <br />link to Lexington <br />600 <br />Connection to neighborhoods /constellation <br />Southwest Roseville <br />N/A <br />Saint Stephens trail to CR B <br />4000 <br />Constellation connection <br />total length <br />12540 <br />710 <br />1200 <br />cost per linear foot at specified width <br />$ <br />40 <br />$ <br />36 <br />$ <br />10 <br />subtotal <br />$ <br />501,600 <br />$ <br />25,560 <br />$ <br />12,000 <br />miscellaneous (tree removal, curb cuts, subcut culvert) at 10 percent <br />$ <br />50,200 <br />$ <br />2,600 <br />$ <br />1,200 <br />contingency at 20% <br />$ <br />110,400 <br />$ <br />5,700 <br />$ <br />21700 <br />TOTAL <br />$ <br />662,200 <br />$ <br />33,860 <br />$ <br />15,900 <br />Total for trails internal to parks $ 711,960 <br />B2 sidewalk $ 1,200,000 <br />Total PRRP estimate for trails component $ 1,911,960 <br />iimetro- inetirosevilleiParkReciParkReciWORKiParkPlansiPark Renewal Program 2012- 2015iPathwaysVCopy of Roseville trail construction estimate 20130918 Prioritized.xlsx]Sheetl <br />