Laserfiche WebLink
��;: proposed sidewalks, we are expanding the pathway network into the larger community, allowing <br />��_ users safer linkages to the regional system. <br />�c The County Road B-2 and Victoria sidewalks will provide a safe and convenient link between <br />�c the local and regional trail networks that will allow users access to numerous area amenities. <br />�c These include, but are not limited to, regional trails, schools, recreational facilities, parks, <br />r� business and retail districts. The most significant of these is the direct connections between <br />�° Central Park Elementary, Concordia Academy, and Roseville Area High School. See <br />��� Attachment A for a depiction of the proposed sidewalk and linkages within the corridor. <br />��� Regional network connections include the Rice Street pathway, Dale Street pathway, County <br />�� Road B Pathway, County Road C Pathway, and the Lexington Avenue pathway. <br />1' FINANCIAL IMPACTS <br />�- This project is being funded by the Parks and Recreation Renewal Program. $2 million of the <br />��: funding is identified for pathways and sidewalks. Preliminary cost estimates have been <br />r� � developed, and are listed below. Construction costs include storm sewer improvements to <br />�° improve drainage and meet watershed district permit requirements for volume control and water <br />�� quality. Hydromethods, LLC, is assisting staff with the drainage design and watershed <br />��� permitting; the engineering fees are estimated at $4,000. <br />Se�ment Estimated Construction Cost <br />B-2, Lexington to Rice $874,000 <br />Victoria, B to B-2 $265,000 <br />Victoria, B-2 to existing crosswalk, east side* $103,000 <br />Victoria, B-2 to existing crosswalk, west side* $201,500 <br />Victoria, existing crosswalk to existing sidewalk $ 60,000 <br />at Prince of Peace <br />Total construction + engineering, east side* $1,306,000 <br />Total construction + engineering, west side* $1,404,500 <br />�.� *Preliminary estimates were prepared for both sides of Victoria to evaluate potential cost-savings <br />�d by utilizing the existing pathway on the east side of the road. Only one of these segments is <br />��� proposed to be constructed. <br />1� STAFF RECOMMENDATION <br />Receive public comment on the proposed County Road B-2 and Victoria sidewalk project, and <br />authorize staff to prepare final plans and specifications and advertise for bids. <br />REQUESTED COUNCIL ACTION <br />��� Receive public comment on the proposed County Road B-2 and Victoria sidewalk project, and <br />authorize staff to prepare final plans and specifications and advertise for bids. <br />Prepared by. Kristine Giga, Interim City Engineer <br />Page 4 of 5 <br />