Laserfiche WebLink
Sanitary Sewer Operations <br />The City maintains a sanitary sewer collection system to ensure the general public's health and general <br />welfare. The following table provides a summary of the 2013 and 2014 (Proposed) Budget: <br />In <br />2013 <br />2014 <br />S Incr. <br />(Decrease) <br />% Incr. <br />ecrease <br />Personnel <br />$ 367,235 <br />$ 422,000 <br />Supplies & Materials <br />46,395 <br />47,350 <br />Other Services & Charges <br />420,545 <br />423,850 <br />Wastewater Treatment <br />3,000,000 <br />3,060,000 <br />Depreciation / Ca ital <br />1,280,000 <br />1,808,000 <br />Total <br />$ 2,301,915 <br />$ 1,998,200 <br />$ 33,715 <br />(1.7)% <br />Total <br />$ 5,114,175 <br />$ 5,761,200 <br />$ 647,025 <br />12.7 <br />The single largest operating cost to the sanitary sewer operation is the wastewater treatment costs paid <br />to the Metropolitan Council Environmental Services Division (MCES). <br />Based on projected flows and increased costs from the MCES, the budget for this category has been <br />increased by 2 %. The City also expects to have a significant increase in personnel costs due to the <br />hiring of a new environmental specialist position. Capital costs are also expected to increase <br />significantly due to planned capital replacements in accordance with the City's Capital Improvement <br />Plan (CIP). The sanitary sewer system portion of the CIP is fully funded. An increase in the City's <br />sanitary sewer usage rates will be needed in 2014. <br />The Sanitary Sewer Fund is in good financial condition and has a current cash reserve of $1,476,000; a <br />significant portion of which is earmarked for future capital replacements over the next 5 -10 years. <br />Storm Drainage Operations <br />The City provides for the management of storm water drainage to prevent flooding and pollution <br />control, as well as street sweeping and the leaf pickup program. The following table provides a <br />summary of the 2013 and 2014 (Proposed) Budget: <br />The City expects to have inflationary -type increases in most operating costs overall. Capital costs are <br />expected to decline slightly in accordance with the City's Capital Improvement Plan (CIP). The storm <br />water system portion of the CIP is fully funded with the exception of inflationary type costs that have <br />occurred during the past two years. This will require an increase in the City's storm water rates for <br />2014. <br />3 <br />2013 <br />2014 <br />S Incr. <br />ecrease <br />% Incr. <br />ecrease <br />Personnel <br />$ 324,615 <br />$ 363,200 <br />Supplies & Materials <br />57,300 <br />79,100 <br />Other Services & Charges <br />281,000 <br />259,900 <br />Depreciation / Ca ital <br />1,369,000 <br />1,296,000 <br />Total <br />$ 2,301,915 <br />$ 1,998,200 <br />$ 33,715 <br />(1.7)% <br />The City expects to have inflationary -type increases in most operating costs overall. Capital costs are <br />expected to decline slightly in accordance with the City's Capital Improvement Plan (CIP). The storm <br />water system portion of the CIP is fully funded with the exception of inflationary type costs that have <br />occurred during the past two years. This will require an increase in the City's storm water rates for <br />2014. <br />3 <br />