My WebLink
|
Help
|
About
|
Sign Out
Home
2013-09-24_PWETC_Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Minutes
>
201x
>
2013
>
2013-09-24_PWETC_Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2013 2:47:09 PM
Creation date
10/24/2013 2:46:56 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
9/24/2013
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Member Stenlund noted that, as the only outlier in his ranking, he had probably <br /> ranked it as he did, even though recognizing that it was critical to connect from <br /> the east to the west, but also recognizing how unrealistic a bridge over I-35W <br /> was. <br /> Member Gjerdingen opined that everything west of I-35W would make very little <br /> sense unless a bridge was going to happen without major redevelopment in that <br /> area. Members Felice and DeBenedet concurred, with indications that those <br /> redevelopment projects would then pay for those pathways. It was undetermined <br /> if those segments should be included on the Pathway Master Plan even if <br /> redevelopment would pay for their installation; while also providing connections <br /> into the City of Minneapolis pathway system. <br /> In conclusion, Member DeBenedet suggested the following determinations from <br /> tonight's discussion: <br /> • Everything identified as on-road striping should be performed when the City <br /> or Ramsey County repaves a street; <br /> • Anything as identified as restriping should be done at the same time and <br /> parallel with construction of off-road pathways; <br /> • Everything currently listed and identified as striping should come off the <br /> spreadsheet, as their insignificant costs are not applicable on the CIP, and are <br /> considered part of any mill and overlay project; <br /> • Add "Fairview Avenue—West Side Sidewalk" to the spreadsheet; <br /> • Re-rank the score for Map #20 County Road B-2 to County Road C segment <br /> from a score of 2.0 and the Dale Street Option 1 combination with a new score <br /> of 1.98; <br /> • Delete Map #13 TH 51 Pathway connection to Old Snelling Avenue in Arden <br /> Hills (Lydia Avenue to City boundary) <br /> • Delete Map #15 Lexington Avenue Dionne Connection to Larpenteur as its <br /> included in another section of Map #15; <br /> • Retain the Wheeler to Fairview and Fairview to Langton Lake Park segments; <br /> • Reconsider ranking for Centre Point Drive to Long Lake Road, either on- or <br /> off-road options and whether or not the ranking is dependent on a future I- <br /> 35W bridge construction; <br /> • Eliminate any duplicates as identified during tonight's discussion, and keep <br /> the higher ranking as applicable. <br /> Mr. Schwartz advised that staff would add the columns back in providing original <br /> Pathway Master Plan scoring and cost columns; and at the request of Member <br /> DeBenedet, staff would strike a line to determine cost to build it up to a certain <br /> point. <br /> Members concurred that more finalization needed to be done before making a <br /> recommendation to the City Council. <br /> Page 15 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.