Laserfiche WebLink
City of Roseville 2014 Fee Schedule <br />Building Permit and Plan Review Fees - continued <br />Investigation Fee: Work without a Permit <br />Whenever any work for which a permit is required from the city has been commenced without <br />first obtaining said permit, a special investigation shall be made before a permit may be issued for <br />such work. An investigation fee, in addition to the permit fee, shall be collected whether or not a <br />permit is then or subsequently issued. The investigation fee shall be equal to the amount of the <br />permit fee required by this code. The payment of such investigation fee shall not exempt any <br />person from compliance with all other provisions of this code nor from any penalty prescribed by <br />law. <br />Manufactured Home Permit Fee: <br />Description <br />2013 Amount <br />2014 Amount <br />New installation <br />$ 260.00 <br />$ 265.00 <br />Mechanical Permit Fee - Residential: <br />Description <br />2013 Amount <br />2014 Amount <br />Air conditioning - new <br />$ 46.00 <br />$ 47.00 <br />Air conditioning - replacement <br />58.00 <br />59.00 <br />Warm air furnace - new <br />97.00 <br />99.00 <br />Warm air furnace - replacement <br />58.00 <br />59.00 <br />Hot water boilers - new <br />97.00 <br />99.00 <br />Hot water boilers - replacement <br />58.00 <br />59.00 <br />Unit heaters <br />58.00 <br />59.00 <br />Swimming pool heaters <br />58.00 <br />59.00 <br />Misc. work & gas piping <br />1.28% of job cost <br />1.28% of job cost <br />Minimum fee <br />58.00 <br />59.00 <br />Gas fireplace <br />58.00 <br />59.00 <br />In floor heat <br />80.00 <br />82.00 <br />Solar panel installation <br />$1.28 % of job cost <br />/ $150.00 min fee <br />$ 1.28 % of job cost <br />/ $153.00 min fee <br />Mechanical Permit Fee - Commercial: <br />Description <br />2013 Amount <br />2014 Amount <br />All commercial work <br />1.28% of job cost / <br />$58.00 min fee <br />1.28% of job cost / <br />1 $59.00 min fee <br />Movin, Permit Fee: <br />Description <br />2013 Amount <br />2014 Amount <br />Over private property only <br />$89.00 <br />$91.00 <br />Over public streets <br />130.00 <br />133.00 <br />Investigation fee per hour <br />$64.75 <br />$66.00 <br />10 <br />