Laserfiche WebLink
Attachment A <br />SS- W -13 -10 <br />3040 Hamline Utility Construction <br />Project Financing Summary <br />Final Cost <br />1 Dave Perkins Contracting, Inc. <br />$ <br />977884.00 <br />2 Total Construction Cost <br />$ <br />97,884.00 <br />3 <br />4 Roseville Engineering <br />$ <br />187038.60 <br />5 Permit Fees (DOH, MPCA, MCES) <br />$ <br />17460.00 <br />6 Construction Testing (Element) <br />$ <br />17321.92 <br />7 Feasibility Report Credit <br />$ <br />(17500.00) <br />s Total Engineering /Permit Cost <br />$ <br />19,320.52 <br />9 <br />10 Total Project Cost $ 1171204.52 <br />11 <br />12 <br />13 Project Financing Summary <br />14 Special Assessments lis 1171204.52 <br />