Laserfiche WebLink
Regular City Council Meeting <br /> Monday,January 13, 2014 <br /> Page 8 <br /> wide. Given the construction in this area, with asphalt used around mailboxes, <br /> Councilmember McGehee questioned how it would hold up if those mailboxes <br /> were ever replaced and a gap left. In the future with such installations, Coun- <br /> cilmember McGehee asked that staff be asked to come up with a solution to either <br /> bunch mailboxes or find another solution rather than asphalt out to the barrier <br /> curb. In her review of other segments of the 8' pathway, Councilmember McGe- <br /> hee noted that it was much more attractive than the segment in front of residential <br /> homes; and questioned how the City could best provide for sufficient wear and <br /> location of mailboxes. <br /> Mayor Roe duly noted this request; with Mr. Trudgeon advising that he would <br /> pass along those comments to staff. <br /> Councilmember Laliberte noted the drainage issues as part of discussions for an <br /> addition at the Corpus Christi campus, and questioned if this project had ad- <br /> dressed those issues as well. <br /> Councilmember McGehee responded that that was a separate drainage issues; <br /> with this project addressing drainage issues for residences across the street closer <br /> to Roselawn Avenue having tuck-under garages. <br /> McGehee moved, Willmus seconded, adoption of Resolution No. 11124 (At- <br /> tachment A) entitled, "Final Contract Acceptance — Fairview Pathway Project <br /> (Northeast Suburban Campus Connector Bike / Pedestrian project) Phase 1;" au- <br /> thorizing final payment and initiating the one-year warranty period. <br /> Roll Call <br /> Ayes: Willmus; Laliberte; McGehee; and Roe. <br /> Nays: None. <br /> f. Request by Meritex Enterprises, Inc., Owner of the Industrial Property at <br /> 2280 Walnut Street, for Approval of a Final Plat of the Existing Outlot in <br /> Preparation for Development <br /> At the request of Mayor Roe, Interim City Manager Patrick Trudgeon briefly re- <br /> viewed this item as detailed in the Request for Council Action (RCA) dated Janu- <br /> ary 13, 2014. <br /> Councilmember Laliberte advised that her intent in removing this item from the <br /> Consent Agenda was to insure a more formal vote, based on the three (3) options <br /> provided in the RCA versus leaving the item under Consent that could create con- <br /> fusion on the actual vote. <br /> Laliberte moved, McGehee seconded, APPROVAL of the proposed Highcrest <br /> Park Sixth Additional FINAL PLAT as presented in the Request for Council Ac- <br />