Laserfiche WebLink
Victoria & B <br />Phosphorus Removed: 8.8 Ibs /yr (23%) <br />Probable Construction Cost: $152,000 <br />$ /Ib removal: $17,273/lb P removed <br />y •n +.7 <br />. C �. <br />;q <br />A' <br />x i <br />0 100 200 io- <br />Feet <br />,,� Option 5 Potential BMP Location <br />.o...,,.g .e.a... Lake McCarrons Subwatershed BMP CWP Project <br />Capitol Region Watershed District <br />(2015 PMP) <br />Filtration Basin i9 <br />�.. t <br />Legend <br />O Proposed option 5 BMP <br />Storm Sewer <br />Existing <br />►— Proposed <br />ELEVATION <br />Minor Contours (2') <br />Major Contours (10') <br />Wetlands <br />O <br />NW Wetlands <br />® Delineated Wetland <br />Figure 6 <br />