My WebLink
|
Help
|
About
|
Sign Out
Home
2014 Approved Budget
Roseville
>
Budget
>
2014 Approved Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2014 4:37:25 PM
Creation date
3/11/2014 4:25:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville — 2014 Budget <br />Capital Improvement Plan Overview <br />As part of the City's Park Renewal Program and the more general Park Improvement Program, the City <br />expects to make nearly $41 million in improvements to regional and neighborhood parks over the next <br />several years. In addition, nearly $10 million in capital replacements are expected at the City's Skating <br />Center and Golf Course. <br />An even larger capital investment is planned for the City's water and sewer infrastructure, much of <br />which was originally installed in the 1960's and 70's and is expected to reach the end of its useful life in <br />the next two decades. Approximately $67 million in utility infrastructure is scheduled for replacement <br />or re- lining procedures. <br />A similar reinvestment is expected with the City's streets and pathways as these infrastructure <br />components proceed through their normal resurfacing and replacement cycles. Approximately $56 <br />million in scheduled improvements are expected over the next 20 years in order to maintain current <br />street condition standards. <br />The City's general vehicles and equipment replacement needs are expected to total roughly $25 million <br />over the next 20 years. Many of these assets are replaced every 10 years, although police and fire <br />vehicles are replaced at varying intervals depending on the vehicle. Aside from park shelters, the City <br />does not expect to make significant repairs or renovations to any City facilities over the next two <br />decades. Only scheduled maintenance -type repairs and replacements are planned. <br />Financial Impact <br />The CIP will have a substantial impact on utility customers and taxpayers. Significant rate increases <br />were enacted during the past two years for the City's water, sanitary sewer, and storm sewer systems to <br />fund scheduled improvements. An additional rate increase of approximately 4.7% overall was enacted <br />in 2014 and thereafter it is expected to increase by an inflationary amount. <br />The impact on property taxpayers is greater however. If all of the property tax - supported items <br />contained in the CIP are funded including; vehicles, equipment, building improvements, and park <br />improvements, taxpayers can expect to pay 34% more each year for the next 20 years. This is in <br />addition to any inflationary -type increases that will be needed for day -to -day operations. <br />This assumes that all property tax - supported capital items will be funded through systematic increases in <br />the annual property tax levy, and that no other alternative funding sources are captured. In addition, it <br />also assumes that all existing assets will be replaced with something similar at the end of their useful <br />lives. It is likely that some assets will be retired with no intent of replacing it. <br />The combined financial impact to Roseville homeowners if all items contained in the CIP are funded <br />would result in an increase of approximately 3.5% perms above and beyond what they're currently <br />paying in property taxes and utility charges. Again, these same homeowners will also face inflationary - <br />type increases for general operations as well. <br />WE <br />
The URL can be used to link to this page
Your browser does not support the video tag.