My WebLink
|
Help
|
About
|
Sign Out
Home
2014 Approved Budget
Roseville
>
Budget
>
2014 Approved Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2014 4:37:25 PM
Creation date
3/11/2014 4:25:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville — 2014 Budget <br />Local Benchmark: Fire personnel injuries with no lost time per 1,000 calls <br />IR2025 Strategy: 5B.2 <br />Description: N/A <br />AkEn 3-Year <br />2010 2011 2012 Average 2013 <br />Calls 41226 41290 41383 41300 <br />Injuries 6 1 1 3 - <br />% per 100 0.142% 0.023% 0.023% 0.062% 0.000% <br />I <br />Local Benchmark: Fire suppression stops /fire confined to room of origin <br />IR2025 Strategy: 5B.1 <br />Description: N/A <br />-tm 3 -Year <br />I I 2010 2011 2012 Average 2013 <br />Structure Fires 47 28 23 33 - <br />Stops 47 27 21 32 - <br />% per 100 100.0% 96.4% 91.3% 96.9% 0.0% <br />Local Benchmark: Fire and EMS cost per call <br />IR2025 Strategy: 5A.1 <br />Description: N/A <br />3-Year <br />2010 2011 2012 Average 2013 <br />$ 61.02 $ 60.59 $ 54.17 $ 58.59 - <br />r•' <br />
The URL can be used to link to this page
Your browser does not support the video tag.