My WebLink
|
Help
|
About
|
Sign Out
Home
2014-03-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2014
>
2014-03-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2014 8:43:56 AM
Creation date
3/20/2014 8:22:46 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/25/2014
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: March 25, 2014 Item No: 4 <br />Item Description: Communication Items <br />Projects update: <br />• 2014 Sanitary Sewer Lining Project — The project was awarded to Insituform <br />Technologies, USA, LLC. The estimate was $945,825, and the low bid came in at <br />$838,270. The pre - construction meeting is scheduled for Wednesday, March 26. A <br />project schedule is not known at this time. <br />• County Road B -2 Sidewalk Construction — Plans and specs were posted on line for the <br />Best Value bidding process as part of the overall Parks and Recreation Department Parks <br />Master Plan Renewal Program. We received two proposals. Those proposals will be <br />scored over the next couple of weeks. <br />• 2014 PMP- The project has been advertised and bids will be opened on April 10t . The <br />project now includes about 1300 feet of water main pipe bursting which is atechnique <br />that pulls a new pipe through the old pipe, essentially breaking up the old pipe in place <br />during the process. This will occur on the 8" water main along County Road B between <br />Haddington Road and West Snelling Service Drive as well as the 6 inch main along <br />Haddington Road north of County Road B. <br />• On Thursday evening, January 23`d, Metro Transit hosted an Open House about the new <br />proposed Bus Rapid Transit line that will run along Snelling Ave and Ford Pkwy /46th <br />Street and ultimately connect to the Hiawatha Light Rail line (now called the Blue Line). <br />Attached are samples of the boards that were presented to the public as well as a <br />summary of the public comments received during the meeting. Construction is expected <br />to begin in late 2014 with the service beginning in late 2015. <br />• Staff is also working on the following projects: <br />o Wheeler Avenue Traffic Management Project <br />o Twin Lakes ROW purchase <br />0 2014 drainage improvements <br />Maintenance Activity: <br />• As of March 19t , there were atotal of 124 reported water service freezes. 54 were still <br />frozen of that date. Frost depth is still reported to be in the 6 to 7 foot range. <br />• There were four water main breaks reported so far during the month of March. <br />0 1600 block of Millwood <br />o Long Lake Road between County Road C2 and County Road D <br />o Garden Ave at Dellwood Ave <br />o County Road B at Fernwood Ave <br />Attachments: <br />A. 5 Year CIP Map Including Ramsey County Projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.