Laserfiche WebLink
Regular City Council Meeting <br /> Monday,February 24, 2014 <br /> Page 6 <br /> stallation of a mixing system to minimize ice build-up in the tank. After review <br /> of references for both firms, their safety record, and other considerations, Mr. <br /> Schwartz advised that staff was recommending awarding the bid to S.E.H. Design <br /> Build, a local firm. <br /> Mr. Schwartz noted that the City of Little Canada was pursuing a similar project, <br /> and if their City Council recommended the same project team, anticipated being <br /> able to coordinate projects for both cities to realize some economies of scale, as <br /> well as better control of the maintenance schedule, since both cities relied on each <br /> other for back-up emergency water service. <br /> As noted in the RCA, Mr. Schwartz advised that Finance Director Chris Miller <br /> had completed a net present value and financial analysis and concurs with the <br /> proposed five-year contract as serving the City of Roseville best. <br /> Mr. Schwartz noted that the three communications providers located on the tower <br /> had been noticed of the recoating this summer, as per their contract, were required <br /> to remove their equipment to a temporary location to be coordinated with City <br /> staff. Mr. Schwartz advised that, as the City of Little Canada determines their <br /> project scheduled and team, Roseville staff would then coordinate a timeframe <br /> this summer to initiate the maintenance work. Mr. Schwartz noted that there <br /> would be little impact to local customers beyond minor pressure fluctuations, <br /> most noticeable in the SW area of the City, even though the City would still be <br /> connected to the Arden Hills tank for additional storage capacity as needed. <br /> Discussion included the epoxy type coating for the inside of the tank provided by <br /> a long-term and reputable company; duration of the maintenance program in 2014 <br /> estimated at approximately eight weeks; need for an internal loan to the Water <br /> Fund from the Sewer Fund for the first year payment of$605,000 due to a lack of <br /> funds in the Water Fund at this time; original cost projections of$800,000 in the <br /> Capital Improvement Program (CIP) budget projections; and deferment of the <br /> work based on favorable annual inspections over the last 3-4 years, with the last <br /> inspection indicating that it was now time to complete the work due to concerns <br /> evidenced with internal rust. <br /> McGehee moved, Willmus seconded, approval to authorize the City Manager to <br /> enter into a five (5) year maintenance contract with S.E.H. Design Build for the <br /> rehabilitation, recoating, and maintenance of the Fairview Avenue, 1.5 million <br /> gallon water tower in an amount not to exceed $694,500 over the term of that con- <br /> tract. <br /> Roll Call <br /> Ayes: Willmus; Laliberte; Etten; McGehee; and Roe. <br /> Nays: None. <br /> Recess <br />