Laserfiche WebLink
of 80% of that order and could take up to 120%, based on the built-in buffer. <br /> When the City, and other agencies, placed their order through the State <br /> contract, Mr. Culver advised that the materials were shipped on barges and <br /> stored in various facilities along the river, and delivered or picked up as <br /> needed. Mr. Culver noted that it was a dynamic situation at this point for who <br /> got the materials first, and where they originated. Mr. Culver advised that <br /> staff was also looking at a potential salt source out of Utah to be delivered by <br /> train through the Dakotas. However, Mr. Culver noted that the delivery was <br /> also impacted by difficulty in finding track time for delivery. <br /> • Map of Ramsey County 2014/2015 proposed projects <br /> Chair Vanderwall expressed interest in seeing this, and specifically the <br /> Lexington Avenue bridge at Highway 36. <br /> • Display of a sample half section of water pipe from the 2013 lining project <br /> using the test product from 3M. <br /> 9. Adjourn <br /> Member DeBenedet moved, Member Vanderwall seconded, adjournment of the <br /> meeting at approximately 8:43 p.m. <br /> Ayes: 4 <br /> Nays: 0 <br /> Motion carried. <br /> Page 13 of 13 <br />