Laserfiche WebLink
<br />. . <br /> <br />January 29, 1999 <br /> <br />WHAT - <br /> <br />Request for moving existing lot line <br /> <br />WHY- <br /> <br />Enhance parking by creating a joint easement. Redevelop 2480 site. <br /> <br />WHERE - <br /> <br />2480 and 2500 Cleveland. <br /> <br />The Alta survey provided shows the entire site, and the lot line follows the row of wood. <br />posts. <br /> <br />By changing the lot line and creating parking easements between these two sites, the <br />parking function is greatly enhanced for both properties. This allows us to expand the <br />2480 building to the north, or build a new building on this site and provide adequate <br />parking for both buildings. <br /> <br />The boundary survey shows the existing lot line along the 2500 building. <br /> <br />I have included a site plan showing a building expansion of the 2480 building with about <br />108,738 square feet oflot area (shown as Section B). An easement agreement on both <br />sides of this lot line will be created for joint parking. <br /> <br />The size of the lot for the 2500 building would be about 124,930 square feet. <br /> <br />Respectfully, <br /> <br />~fM <br /> <br />Dale Joel <br />