My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02993A
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2900
>
pf_02993A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 11:41:24 AM
Creation date
11/18/2004 6:24:47 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2993A
Planning Files - Type
Miscellaneous
Address
2660 CIVIC CENTER DRIVE
Project Name
CITY CENTER CAMPUS
Applicant
CITY OF ROSEVILLE
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Commuter rail study urges phased construction <br /> <br />Page 3 of3 <br /> <br />easier access to the metro area and to the St. Cloud area as wen." <br /> <br />The next step in the Northstar Corridor study will include preliminary <br />engineering that win nail down exact costs, develop an agreement <br />with Burlington Northern Sante Fe for use of its rails, set the timing <br />for getting the project going and determine funding sources, Yantos <br />said. <br /> <br />@ Copyright 1998 Star Tribune, All rights reserved. <br /> <br />http://www2.startribune.com/cgi-bin/stOnLine/article?thisSlug=RAIL 15&date= 15-Dec-98&wor~ord=c <br />
The URL can be used to link to this page
Your browser does not support the video tag.