Laserfiche WebLink
<br />Mr. st.ve Sarkozy <br />Fëruary 25, 1991 <br />Page Two <br /> <br />2. In no event will Tanurb's half of such cost. (not <br />inclusive of the $10,000 referred above) exceed $30,000. In <br />other words, the maximum that Tanurb would be required to <br />pay wou14 Þe $10,000, pluø one-half of the ditterenoe up to <br />a maximum of $30,000, for a total of $40,000: <br /> <br />3. In the event that the 01 ty requires the <br />oonstruction of the loadin; dock soreen wall, then Tanurb <br />will only be required to pay halt ot the total of such <br />coata: the $10,000 referred to above will be used by Tanurb <br />to construct the loading dock screen wall: and <br /> <br />4. The city pays the balance of the cost of the fence. <br /> <br />This a;,%'...ent is also based upon the a.sumption that the <br />City will approve all necessary variances to aocomplish the above <br />agreements. We understand that such variances would be handled <br />on a routine basi. as part ot the consent-agenda of the Planning <br />Co~is.ion and City Council in for~hcomin9 meetin;., <br /> <br />If the above unðeretand1ngs are not correct, please let me <br />know so that I can modify this l.~t.r appropriately prior to this <br />evening's meeting. <br /> <br />Very "truly yours, <br />"\A I .. l.. ttW- <br />,~ww-- - <br />Mark W. W.stra <br /> <br />MWW:su. <br />co: Mr. Robert Bell, Esq. <br />Hr. Thomas Ehrlich <br />Hr. Daniel Roaa <br /> <br />----------- <br /> <br />- - - - - -- - - <br />