Laserfiche WebLink
<br /> -11 .~ ~~ -' ...; J. J....J. -t'~ ,-- (.,..'1-- ~ r-1.:J~~.)~_.J.. H I ~.:J <br /> <br />EHCROACHMENT REOUEST <br /> <br />TO: Transmission Engineering <br />Transmission Maintenance <br /> <br />Encroachment Request - Line ý~ '3 Structure No. Plan & Profl1e No. <br />Section .!' Township 7-, Range..L:l.. W/O No. E- <br /> <br />The attached material pertains to a request to construct a within <br />the right of way for the subject line. Please review the plans and highlight the following <br />conditions which pertain to this project. If you have additional comments. please respond <br />in the space ~rovid~d. T~~~~ you in_advance for your cooperation. <br /> <br />(1) xcav . n 1 5 stru <br />A minimum distance of feet of supported earth must be maintained from any <br />part of the transmission line structure. Support of the ground beyond the <br />feet may be provided by a slope no greater than three feet horizontal to one foot <br />vertical. Support may also be provided by the use of cribbing. sheet piling. <br />retaining wall or tunneling. The specific plan for providing the required support and <br />the excavation plan for the proposed project must be submitted to NSP for review and <br />approval. _ ' <br /> <br />(2) Grade chanQe around structure locition ' <br />Fill around or above steel structure foundations is not permitted. Qß Fill around <br />wood pole structures may be permitted upon submitting plans and subsequent written <br />approval of NSP. The grade around the st~uctures must ~~ovide for surface water <br />runoff ~-'":::,nG s¡,¡rface water ponding around structures wil1 be permitted. Any cost <br />related to the adjustment of NSP's facilities will be at the requesters expense. <br /> <br />(3) fill and9rade change around QUY wires'and anchors <br />Fill above the steel anchor rod onto the guy wire is not permitted. The specific plan <br />for any grade change or excavation 1n the vicinity of down guys and anchors must be <br />submitted to NSP for review and approval. <br /> <br />~ Grade changewithin e¡sement, ,A~~ <br />~ The ground elevation within the easement shall not be increased above£·~~~"et <br />mean sea level, 1929 adjustment or above the eXisting or proposed grade. Stockpiling <br />of soil and/or material within the easement will not be permitted. <br /> <br />~çlearances to eqU;Dment~ . <br />~ A working clearance 0 'Z () .. feet between the electrical conductors and any cranes <br />or digging equipment u r near the easement, must be maintained at all times. <br />If this clearance cannot be maintained, the contractor or developer must arrange for <br />a line outage by calling NSP's System Control Department (Jim Palashewski 330-6134 or <br />6135). At least two weeks advanced notice must be provided in order to schedule a <br />line outage. There is a fee of approximately $350 per day for this service. This fee <br />must be paid prior to outage. ' <br /> <br />(6) landscaDin9 within the easement <br />Detailed plans for landscaping (including light standards) must be submitted to NSP <br />for review and approval. Generally shorter varieties of trees and shrubs may be <br />considered. If planting is permitted, the lihe's voltage and the tree's mature height <br />and the distance frDm the line must be considered. For maintenance purposes there <br />shall be no planting within 1~ feet of structure sites. <br /> <br /> <br />...: <br /> <br />encrochr.sf <br /> <br />Page -1- <br /> <br />.. February 28, 1991 <br />