Laserfiche WebLink
VI-a7.2 <br />VI-a9.1 <br />VI-e0.1 <br />VI-e1.0 <br />VI-e2.0 <br />VI-e2.1 <br />VI-e3.0 <br />VI-m0.1 <br />VI-m1.1 <br />VI-m2.1 <br />VI-m3.1 <br />VI-51.1 <br />VI-51.2 <br />VI-52.1 <br />Interior Elevations <br />Reflected Ceiling Plan <br />Electrical Legend & General Notes <br />Electrical Site Plan & Details <br />Lighting Plan <br />Power & Auxiliary Plan <br />Electrical Single Line Diagram & Schedules <br />Mechanical Notes <br />HVAC Plan <br />Plumbing Plan <br />Mechanical Details, Schedules, & Risers <br />Footing & Foundation Plan <br />Roof Framing Plan <br />Wall Framing Elevations <br />5. Addendum 1 prepared by LHB, Inc. dated February 11, 2014 <br />6. Addendum 2 prepared by LHB, Inc. dated February 25, 2014 <br />7. Addendum 3 prepared by LHB, Inc. dated February 28, 2014 <br />Villa Park <br />Villa Park <br />Villa Park <br />Villa Park <br />Villa Park <br />Villa Park <br />Villa Park <br />Villa Park <br />Villa Park <br />Villa Park <br />Villa Park <br />Villa Park <br />Villa Park <br />Villa Park <br />EXCLUSIONS: <br />Based on the updated Best Value PIPS bid philosophy, our proposal included only what the drawings and <br />specifications show (as noted above) which may not be what the owner needs or intends. Currently the <br />items listed below are excluded from our proposal. <br />1. Splash Pad foundations, underground plumbing, equipment and concrete slab to be by Owner <br />direct with splash pad vendor. <br />2. Per our deduct pricing listed in the "Financial Summary" we have excluded work at Acorn Park, <br />Central Park Lexington, all rinks except Lexington Park, and all other deduct pricing items listed <br />in "Financial Summary". <br />SECTION 6 — PROJECT ASSUMPTIONS <br />A detailed list of all proposal assumptions that may impact cost, schedule, or satisfaction. <br />We have assumed that the splash pad foundations, equipment and <br />Assumption 1: concrete slab is to be provided by the Owner. Thus, this scope of work is <br />not included in our bid. <br />If our assumption was incorrect, we will solicit pricing from the vendor and <br />Solution / Strategy: present this to the Owner for approval and inclusion in a change order. <br />We are assuming that the Conformed Documents which will be issued by <br />Assumption 2: LHB, Inc. will be in line with the deduct pricing we have already completed <br />during the Clarification Phase. <br />If our assumption was incorrect, we will submit pricing to the Owner for any <br />Solution / Strategy: additional or eliminated work shown on the Conformed Documents that <br />was not included in the pricing completed during the Clarification Phase. <br />18 <br />