My WebLink
|
Help
|
About
|
Sign Out
Home
2014_0512_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2014
>
2014_0512_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 1:45:24 PM
Creation date
5/8/2014 2:29:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6 — PROJECT ASSUMPTIONS <br />A detailed list of all proposal assumptions that may impact cost, schedule, or satisfaction. <br />Assumption 1: � The Work Schedule As Presented In The Documents Is Accurate. <br />We met with the facility staff and better understand the reoccurring <br />activities hosted at the building that were not previously communicated. At <br />this meeting, the staff indicated we would be issued a schedule of events <br />from the owner. Once we receive this information, we will accommodate <br />the reoccurring activities by focusing our efforts away from spaces where <br />Solution / Strategy: visitors may be, and in advance of visitors we will clean and make area safe. <br />Based on the information provided by the staff, the events were small, <br />could be rescheduled as needed, and infrequent, which leads us to believe <br />the change in occupancy plans during construction does not pose a risk to <br />our schedule, costs, or customer satisfaction. <br />Assumption 2: <br />Fragile Interior Displays Will Be Relocated As Required For Construction <br />By Owner. <br />We have met with the owner and developed a plan to move and store the <br />vast majority on-site. The owner will move the display pieces to the kitchen <br />space, and potentially send the animals to the taxidermist for cleaning if <br />Solution / Strategy: <br />space is limited in the kitchen area. Our schedule allocated a 2 week period <br />for moving activities and considers completing moving by 11.16.14. If <br />moving is not completed by this date, our start date could be delayed, and <br />subsequently our completion date could be pushed out. We do not see any <br />potential for this to impact costs to the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.