Laserfiche WebLink
City of Roseville <br />Construction — Proposal Package C(Harriet Alexander Nature Center) <br />Best Value Selection Summary <br />Section 1: Summary of Scores <br />Raw Data <br />Possible <br />No Criteria Points C-1 C-2 <br />1 Cost Proposal —Total Base 250 $276,500 $257,700 <br />2 Interview Rating 350 6.7 6.7 <br />3 Risk Plan Rating 150 5.0 5.0 <br />4 Project Capability Plan Rating 100 6.7 g.2 <br />5 Value Added Plan Rating 100 6.7 5.0 <br />6 PPI 50 9.9 10.0 <br />Total Availble Points 1000 <br />Section 2: Ranking <br />Proposer Total Score Difference <br />C-2 975 -- <br />C-1 955 20 <br />Section 3: Committee Ratings <br />Risk Plan <br />Evaluator <br />Evaluatorl <br />Evaluator2 <br />Evaluator3 <br />Evaluator4 <br />Evaluator5 <br />Evaluator6 <br />Gi <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5.0 <br />G2 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5.0 <br />PM Interview Ratings <br />Evaluator C-1 C-2 <br />Evaluatorl 10 10 <br />Evaluator2 5 5 <br />Evaluator3 5 5 <br />Evaluator4 5 5 <br />Evaluator5 10 10 <br />Evaluator6 5 5 <br />Average 6.7 6.7 <br />Capability Plan Ratings <br />Evaluator C-1 C-2 <br />Evaluatorl 5 10 <br />Evaluator2 5 10 <br />Evaluator3 10 10 <br />Evaluator4 5 5 <br />Evaluator5 10 10 <br />Evaluator6 5 10 <br />Average 6.7 91 <br />ilue-Added Propc <br />Evaluator C-1 <br />Evaluatorl 5 <br />Evaluator2 10 <br />Evaluator3 10 <br />Evaluator4 5 <br />Evaluator5 5 <br />Evaluator6 5 <br />Averaae 6.7 <br />Ratin <br />G2 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5.0 <br />April 8, 2014 <br />Poi nts <br />G1 G2 <br />233.0 250.0 <br />350.0 350.0 <br />150.0 150.0 <br />72.7 100.0 <br />100.0 75.0 <br />49.5 50.0 <br />955 975 <br />