Laserfiche WebLink
SECTION 1— FINANCIALSUMMARY <br />Value Added <br />I�c•� <br />Client Requested Scope Changes <br />DESCRIPTION <br />Total Approved Value Added <br />cosT ($) <br />$0.00 <br />NO DESCRIPTION DURATION <br />1 Price to provide and install a lighting control system in lieu of the City- ADD $26,845.00 <br />supplied control link system. The new system will include lighting <br />contactor cabinet with manual override switch, mechanical time clock <br />with battery back-up, photocell and remote push button with timing <br />relay. Hockey rinks will include conduit and wire for push button not <br />included in original contract documents. <br />* See attached sheet for breakdown between parks. <br />2 Add flashing warning light system to all courts and rinks in Item 1. ADD $3,550.00 <br />3 Sandcastle Park— remove/dispose of rink lights and replace with City- ADD $980.00 <br />supplied lights. Relamp. <br />4 Eliminate Dale West DEDUCT ($10,000.00) <br />5 Central Park BL— eliminate parking lot lighting Type A, A1 and B and sign DEDUCT ($26,785.00) <br />connection. <br />6 Central Park BL— eliminate new service and 4" PVC telecom conduit. DEDUCT ($8,325.00) <br />7 Central Park BL— unit price to eliminate pedestals: 17 ea @$1,950/ea = DEDUCT ($33,150.00) <br />8 Central Park BL— replace existing 400A switch board in existing cabinet ADD 3,800.00 <br />with 400A panel board, including disconnect and reconnect to all <br />existing loads. Panel to have minimum (12) spaces for future loads. <br />Total Approved Client Scope Changes: ($43,085.00) <br />Final Cost Proposal <br />NO DESCRIPTION <br />1 Original Proposal Cost <br />2 Total Approved Value Added Options <br />3 Total Client Requested Scope Changes <br />COST ($) <br />$447,705.00 <br />$0.00 <br />( $43, 085.00 ) <br />Final Project Cost $404,620.00 <br />