SECTION 6 — PROJECT ASSUMPTIONS <br />A detailed list of all proposal assumptions that may impact cost, schedule, or satisfaction. <br />Assumption 1: Reasonable site access and durations <br />If our assumption was incorrect, we will....try to comply to the best of our <br />Solution / Strategy: ability. <br />Assumption 2: Bid Package A coordination/involvement <br />Solution / Strategy: If our assumption was incorrect, we will....try to comply. <br />Assumption 3: Reasonable soil conditions/water table <br />Solution / Strategy: <br />If our assumption was incorrect, we will....immediately notify Owner, <br />complete Engineering review with cost impacts. <br />Assumption 4: Reasonable Owner supplied material delivery <br />Solution / Strategy: If our assumption was incorrect, we will....try to comply. <br />