Laserfiche WebLink
SECTION 6 — PROJECT ASSUMPTIONS <br />A detailed list of all proposal assumptions that may impact cost, schedule, or satisfaction. <br />We can put the fields into play faster than the schedule calls for which <br />Assumption 1: could allow us to do more fields per year <br />Solution / Strategy: If our assumption was incorrect, we will stick to the existing schedule <br />Assumption 2: Contractors working on other projects at the same sites will stay on there <br />schedule not delaying us <br />If our assumption was incorrect, we will fall behind schedule. To manage <br />Solution / Strategy: this we will consistently monitor the performance of other contractors <br />working on these sites. <br />Assumption 3: City will fund the purchase of certain items upfront to avoid price <br />increases <br />Solution / Strategy: If our assumption was incorrect, there could be cost changes <br />