My WebLink
|
Help
|
About
|
Sign Out
Home
2014_0512_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2014
>
2014_0512_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 1:45:24 PM
Creation date
5/8/2014 2:29:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville <br />Construction - Proposal Package G(Field Improvements) <br />Best Value Selection Summary <br />Section 1: Summary of Scores <br />Raw Data <br />Possible <br />No Criteria Points G-1 G-2 G-3 <br />1 Cost Proposal -Total Base ZSO $1,540,000 $2,413,750 $2,559,920 <br />2 Interview Rating 350 5.8 7.9 5.4 <br />3 Risk Plan Rating 150 5.0 5.0 5.0 <br />4 Project Capability Plan Rating lo0 5.0 5.0 9.2 <br />5 Value Added Plan Rating l00 5.0 5.8 6.7 <br />6 PPI 50 5.4 9.2 9.5 <br />Total Availble Points 3000 <br />Section 2: Ranking <br />Proposer Total Score Difference <br />G-2 850.0 -- <br />G-1 815.9 34.1 <br />G-3 789.9 26.0 <br />Section 3: Committee Ratings <br />Project Manager Interview Ratings <br />G-1 G-2 G-3 <br />Evaluator <br />Evaluatorl 10 10 10 <br />Evaluator2 5 10 5 <br />Evaluator3 10 10 5 <br />Evaluator4 5 5 5 <br />Evaluator5 5 5 5 <br />Evaluator6 5 10 5 <br />Evaluator <br />Evaluatorl <br />Evaluator 2 <br />Evaluator3 <br />Evaluator4 <br />Evaluator5 <br />Evaluator 6 <br />Averaa� <br />Risk Plan Ratings <br />G-1 G-2 G-3 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5.0 <br />5 5 <br />5 5 <br />5 5 <br />5 5 <br />5 5 <br />5 5 <br />5.0 5.0 <br />Site <br />Evaluator <br />Evaluator <br />Evaluator <br />Evaluator <br />Evaluator <br />Evaluator <br />Evaluator <br />rintendent Interview Ratir <br />G-1 G-2 G-3 <br />5 10 5 <br />5 5 5 <br />5 10 5 <br />5 5 5 <br />5 5 5 <br />5 10 5 <br />Capability Plan Ratings <br />G-1 G-2 G-3 <br />Evaluator <br />Evaluatorl 5 5 10 <br />Evaluator2 5 5 10 <br />Evaluator3 5 5 5 <br />Evaluator4 5 5 10 <br />Evaluator5 5 5 10 <br />Evaluator6 5 5 10 <br />Average 5.0 5.0 9.2 <br />March 13, 2014 <br />Poi nts <br />G-1 G-2 G-3 <br />250.0 159.5 150.4 <br />257.9 350.0 239.5 <br />150.0 150.0 150.0 <br />54.5 54.5 100.0 <br />75.0 87.5 100.0 <br />28.4 48.4 50.0 <br />815.9 850.0 789.9 <br />Value-Added Proposal Ratings <br />G-1 G-2 G-3 <br />Evaluator <br />Evaluator 1 5 5 10 <br />Evaluator2 5 5 5 <br />Evaluator3 5 5 10 <br />Evaluator4 5 10 5 <br />Evaluator5 5 5 5 <br />Evaluator6 5 5 5 <br />Average 5.0 5.8 6.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.