Laserfiche WebLink
SECTION 2— PROJECT DURATION SUMMARY <br />Approved Value Added Options <br />NO DESCRIPTION <br />1 Deduct Rain Sensors <br />2 Replace Booster Pump at Autumn Grove with a AY McDonald Booster <br />Pump <br />3 6" Hunter 1-25 to 4" Rain Stainless Steel Pro Sport <br />4 Add Flow Sensors <br />Total Approved Value Added Options <br />Client Requested Scope Changes <br />NO DESCRIPTION <br />1 Change CP Victoria East from a new install ($87,427.56) to Replacing <br />water service, new two wire path, new CS 3500 Controller and some <br />additional main line and Quick Coupler valves. ($38,785.00) <br />2 CP Lexington Ball Field Base Quote ($29,412.44) to 2 wire Acclima only <br />in ball filed. ($16,317.00) <br />3 CP Lexington Flowers (Street Scape) Additional Two Wire <br />4 Eliminate Oasis Park <br />5 Eliminate Villa Park <br />Total Approved Client Scope Changes <br />Final Project Duration <br />NO DESCRIPTION <br />1 Original Proposal Duration (Days) <br />2 Total Approved Value Added Options (Days) <br />3 Total Client Requested Scope Chan�es (Davs <br />3 <br />Final Project Duration <br />DURATION <br />-1 <br />0 <br />��,� <br />G <br />: <br />DURATION <br />14 <br />7 <br />Q <br />m <br />� <br />m1 <br />DURATION <br />Calendar Days <br />62 <br />9 <br />20 <br />91 <br />