Laserfiche WebLink
City of Roseville <br />Construction - Proposal Package H (Irrigation) <br />Best Value Selection Summary <br />Section 1: Summary of Scores <br />Raw Data <br />Possible <br />No Criteria Points H-1 H-2 H-3 H-4 H-5 <br />1 CostProposal-TotalBase 250 $371,700 $293,324 $422,834 $327,539 $244,911 <br />2 Interview Rating 350 5.8 6.3 7.1 6.3 5.8 <br />3 Risk Plan Rating 150 5.0 6.7 4.3 8.3 4.3 <br />4 Project Capability Plan Rating 100 5.0 6.7 4.3 9.2 5.0 <br />5 Value Added Plan Rating 100 5.0 6.7 4.3 8.3 5.0 <br />6 PPI So 9.7 6.6 5.0 9.9 5.0 <br />Total Availble Points 3000 <br />Section 2: Ranking <br />Proposer Total Score Difference <br />H-4 896 -- <br />H-2 824 72 <br />H-5 756 68 <br />H-1 706 50 <br />H-3 697 9 <br />Section 3: Committee Ratings <br />Evaluator <br />Evaluator 1 <br />Evaluator 2 <br />Eval u ato r 3 <br />Evaluator4 <br />Evaluator 5 <br />Evaluator 6 <br />Evaluator <br />Evaluator 1 <br />Evaluator 2 <br />Evaluator 3 <br />Eval uator 4 <br />Evaluator 5 <br />Evaluator 6 <br />Risk Plan Rati <br />Evaluator <br />Evaluator 1 <br />Evaluator 2 <br />Evaluator 3 <br />Evaluator4 <br />Evaluator5 <br />Evaluator6 <br />ct Manager Interview Ratings <br />H-1 H-2 H-3 H-4 <br />10 10 10 10 <br />5 10 5 5 <br />5 5 5 5 <br />5 5 5 5 <br />5 5 5 5 <br />5 5 10 5 <br />H-5 <br />10 <br />10 <br />5 <br />10 <br />5 <br />10 <br />Plan <br />March 17, 2014 <br />Points <br />H-1 H-2 H-3 H-4 H-5 <br />164.7 208.7 144.8 186.9 250.0 <br />288.2 308.8 350.0 308.8 288.2 <br />90.0 120.0 78.0 150.0 78.0 <br />54.5 72.7 47.3 100.0 54.5 <br />60.0 80.0 52.0 100.0 60.0 <br />49.0 33.3 25.3 50.0 25.3 <br />706 824 697 896 756 <br />Value-Added <br />Evaluator H-1 H <br />Site Superintendent Interview Ratings <br />Evaluator H-1 H-2 H-3 H-4 H-5 <br />Evaluator 10 10 10 10 10 <br />Evaluator 5 5 5 5 5 <br />Evaluator 5 5 5 5 5 <br />Evaluator 5 5 5 5 5 <br />Evaluator 5 5 5 5 5 <br />Evaluator 5 5 5 5 5 <br />