My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02330
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2300
>
pf_02330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 11:47:47 AM
Creation date
12/8/2004 11:09:40 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2330
Planning Files - Type
Division of Land
Address
2750 PATTON RD
Applicant
ROSEVILLE BUS COM 3/JOHN BE
Status
APPROVED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PLANNING REPORT <br /> <br />DATE: <br /> <br />13 May, 1992 <br /> <br />CASE NUMBER: <br /> <br />2330 <br /> <br />APPLICANT: <br /> <br />John Bell <br />KK-Three Corp. <br /> <br />LOCATION: <br /> <br />Patton Road & Hwy 88 <br /> <br />ACTION REQUESTED: <br /> <br />Lot Division <br /> <br />PLANNING CONSIDERATIONS: <br /> <br />1. BACKGROUND <br /> <br />KK-Three owns the Roseville Business Commons (RBC) buildings on <br />Patton Road and wants to develop a lot at the end of the cul-de-sac <br />to build RBC IV. The property will be a 5.09-acre triangular parcel <br />created from a piece of excess MnDOT right-of-way for Highway 88 <br />and a larger parcel purchased from the adjacent Williams Pipe Line <br />Company. RBC IV will be similar to the existing RBC buildings and <br />will comply with all zoning ordinance standards and will not need <br />separate approval from the Planning commission and Council. The <br />application here is only for the lot division of the Williams <br />parcel into two lots, one of which will be sold to KK-Three for RBC <br />IV. KK-Three will combine this new lot with the MnDOT lot to make <br />one tax parcel. We have reviewed the architectural plans for RBC IV <br />and have indicated to the applicant that with certain modifications <br />we can issue a building permit for the building without additional <br />zoning review. KK-Three is anxious to get the building under way <br />and have applied for and received grading and foundation permits <br />for the building at their own risk, with the explicit written <br />understanding that if the lqt division is not approved for any <br />reason, they must return the site to its original condition. <br /> <br />2. DEVELOPMENT ANALYSIS <br /> <br />The application is for the division of the lot and not for any of <br />. the site development issues. There are engineering concerns that <br />will be handled in the building permit process but which do not <br />affect the lot division. The property is guided Industrial and <br />zoned 1-2. The proposed use is appropriate and the lot has <br />reasonable size, configuration and access to accommodate the use. <br /> <br />3. CONCLUSION AND RECOMMENDATION <br /> <br />We recommend approval of the lot division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.