My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02355
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2300
>
pf_02355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 11:48:43 AM
Creation date
12/8/2004 11:10:09 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2355
Planning Files - Type
Planning-Other
Address
2231 RICE ST
Applicant
DUFFY DEVELOPMENT COMPANY
Status
APPROVED
PIN
122923440027
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />t, /, <br />" <br /> <br />..>: <br /> <br />Phil Carlson <br />Karl P. Keel, Assistant Public Works Department~ <br />CALIBRE RIDGE TOWNHOMES/DUFFY DEVELOPMENT PROJECT <br /> <br />rom: <br /> <br />. . <br />. . <br /> <br />,te: <br /> <br />December 23, 1991 <br /> <br />The engineering department has reviewed the utility plans dated <br />September 17, 1991, submitted for final PUD approval. We offer <br />the following comments: <br /> <br />1. <br /> <br />Plan and profile sheets are required for all public <br />utilities. These plans should include the location of all <br />existing and proposed utilities. Gate valves are required <br />on all hydrant leads and large service connections. <br /> <br />Curb boxes/building shutoffs should be shown for all water <br />services. <br /> <br />- _ - 2. <br />-.~ <br /> <br />"' <br /> <br />,- <br /> <br />3. Manholes must be built where catch basin leads connect <br />\11Ì th the new storm sewer. <br /> <br />4. A flared end section with appropriate erosion control <br />must be provided on the discharge to MnDOT's right-of-way. <br />A copy of MnDOT's permit to allow this work will be required <br />prior to the issuance of any building permits,. <br /> <br />5. Conflicts exist between the proposed landscaping plan and <br />proposed utilities including street lights and buried <br />electric. The utilities should be drawn on the landscape <br />plan to eliminate this problem. <br /> <br />6. Complete legal descriptions for the proposed vacated <br />easements and new easements are needed. <br /> <br />7. Drawings should be prepared by a qualified draftsman and <br />incorporate accepted industry drafting standards. <br /> <br />.............. <br />
The URL can be used to link to this page
Your browser does not support the video tag.