Laserfiche WebLink
<br />To: Phil Carlson <br />From: Karl P. Keel, Assistant Public Works Department~ <br />RE: CALIBRE RIDGE TOWNHOMES/DUFFY DEVELOPMENT PROJECT <br /> <br />Date: December 23, 1991 <br /> <br />The engineering department has reviewed the utility plans dated <br />September 17, 1991, submitted for final PUD approval. We offer <br />the following comments: <br /> <br />;.r. Plan and profile sheets are required for all public <br />utilities. These plans should include the location of all <br />existing and proposed utilities. Gate valves are required <br />on all hydrant leads and large service connections. <br /> <br />)(. Curb boxes/building shutoffs should be shown for all water <br />services. <br /> <br />)t. Manholes must be built where catch basin leads connect <br />with the new storm sewer. <br /> <br />)Y. A flared end section with appropriate erosion control <br />must be provided on the discharge to MnDOT's right-of-way. <br />A copy of MnDOT's permit to allow this work will be required <br />prior to the issuance of any building permits. <br /> <br />~ Conflicts exist between the proposed landscaping plan and <br />proposed utilities including street lights and buried <br />electric. The utilities should be drawn on the landscape <br />plan to eliminate this problem. <br /> <br />ß. Complete legal descriptions for the proposed vacated <br />easements and new easements are needed. <br /> <br />7. Drawings should be prepared by a qualified draftsman and <br />incorporate accepted industry drafting standards. <br />