Laserfiche WebLink
<br /> <br />DEvEWPMENTCoRPORATION <br /> <br />400 SELBY AVENUE · SUITE C <br />SAINT PAUL, MINNESOTA 55102 <br />(612) 292-0211 <br /> <br />October 24, 1991 <br /> <br />Roseville City Council <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, HN 55113 <br /> <br />RE: Calibre Ridge Partnership Request for General Concept Approval & <br />Rezoning From R-3A & R-1 to PUD at 2231 Rice Street <br /> <br />Dear Councilmembers: <br /> <br />The Calibre Ridge Partnership is pleased to submit for your review and <br />consideration the following Calibre Ridge project changes in response <br />to the Roseville Planning Commission conditional approval of our <br />request for PUD zoning. <br /> <br />3a. Utility Easements & Sanitary Sewer Line <br /> <br />Mr. Karl Keel has reviewed and approved the sewer line and <br />easements as attached. <br /> <br />3b. Modified Site Plan & Landscaping to accommodate easements and <br />revised grading are enclosed. Some trees in easements were <br />replaced with shrubbery to meet City requirements. <br /> <br />3c. Marion Street Bike Trail has been eliminated from the attached <br />plans. <br /> <br />3d. Playground Areas as shown on the enclosed landscaping plan have <br />been reviewed by the City Planner. We have attempted to provide <br />some age segregation by separating play equipment in 4 parts. <br />Two sites are geared to the pre-school to early grade school <br />age. One is located on the south side of the driveway in the <br />south westerly corner, the other just behind the farthest east <br />building. Both include a picnic table and trash recepticle to <br />encourage parents to stay to watch their children. A swing set <br />has been located on the west edge of the site (the former <br />basketball site) and the basketball court is tucked into the east <br />end of the southern parking lot. <br /> <br />3e. Construction Schedule is currently geared to complete the project <br />within 1 construction season to minimize extra costs for more <br />than one scheduled time for landscapers and asphalt layers. <br />However, if it becomes necessary to build units within several <br />construction seasons, we will not occupy the buildings before <br />completing landscaping, parking and play areas for those <br />respective units. <br />