Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: May 27, 2014 Item No: 4 <br />Item Description: Communication Items <br />Projects update: <br />• 2014 Sanitary Sewer Lining Project — The contractor has completed the pre - cleaning of <br />all the lining segments. During the cleaning process, they identified some offset joints <br />that will require point repairs prior to lining which will delay the lining of these lines as <br />the repairs are performed. The contractor has lined approximately 2 miles of the 6.3 mile <br />project. The project should be complete in August. <br />• County Road B -2 Sidewalk Construction — This project consists of constructing a 6 foot <br />sidewalk along the north side of County Road B2 from Lexington Ave to Rice Street as <br />well as along Victoria Street from County Road B2 north to County Road C. The contract <br />was recently awarded to T.A. Schifsky and Sons, Inc. and construction is expected to <br />begin in late June and be complete before school starts in September. Staff is working to <br />schedule meetings with impacted property owners in the meantime. <br />• 2014 PMP- The project was recently awarded to Valley Paving, Inc. Within the last week <br />sport curb repairs have begun as well as repairs to catch basins and other utility <br />structures. Actual milling and paving operations are expected to begin in early June. <br />• Snelling Ave Bus Rapid Transit: On Tuesday evening, May 20th, Metro Transit hosted <br />an Open House at the Roseville Library about the new proposed Bus Rapid Transit line <br />that will run along Snelling Ave and Ford Pkwy /46th Street and ultimately connect to the <br />Hiawatha Light Rail line (now called the Blue Line). We have not yet received <br />information from Metro Transit on any comments submitted at this meeting, but will <br />present those to the PWET Committee as they become available. Construction of the <br />stations is expected to begin in late 2014 with the service beginning in late 2015. <br />• 2014 Seal Coat Project: This year's seal coat project was recently awarded to Pearson's <br />Bros., Inc. Due to an increase in prices this year the seal coat program is being reduced <br />slightly in order to stay within the budget. Actual seal coat operations should begin in the <br />first or second week of June and be complete by the end of June. <br />• South Owasso Boulevard Private Drive: Staff met with residents along the private road <br />portion of South Owasso Boulevard on Wednesday, May 21st to discuss existing storm <br />water concerns and the City's and Watershed's desire to manage the direct discharge into <br />Lake Owasso. Staff will be working on a potential 2015 project to improve the storm <br />water management in this area. <br />Maintenance Activity: <br />• Public Works staff has recently completed the City wide spring street sweeping. Staff <br />will continue to sweep spot locations on an as needed basis. <br />