Laserfiche WebLink
NPDES PHASE II Permit <br />City of Roseville 2013 Annual Report <br />Best Management Practices / Minimum Control Measures <br />Attachment A <br />Unique <br />I D <br />Title <br />Measurable Goal <br />Implementation Status <br />Yesl No <br />1c -5 Education Pro mm <br />Post - construction Storm <br />Water Management in New <br />Development and <br />Redevelopment <br />See 5a -1, 5b-1, 5c -1 <br />X <br />Currently in place and will continue. Annually solicit and develop new materials <br />1c -6 Education Program <br />Pollution Prevention / Good <br />Housekeeping for Municipal <br />Operations <br />See 6a -1, 6a -2, 61b-1, 61b-2, 61b-3, 61b-4, 61b-5, 66-6, 61b-7 <br />X <br />Currently in place and will continue. Annually solicit and develop new materials <br />1d -1 Coordination of Education Pro ram <br />See l lb-1 1s -1 1s -2 1s -3 1s -4 1s -5 1s -6 I X I ICurrently in place and will continue. Annually solicit and develop new materials <br />1e -1 Annual Public Meeting <br />IMeeting completed I I X I IMeetings conducted annually prior to the SWPPP submittal <br />BMP Area 2: Public Participation and Involvement WM <br />2a -1 Comply with Public Notice Re uirements <br />Completed public notice requirement (y /n) <br />X <br />I <br />30 -day notice for annual storm water public meeting will be published every year <br />through the life of the permit. <br />Number of locations notice was posted <br />1 4 <br />2b -1 Solicit Public Input and Opinion on the Ade ua of the SWPPP <br />!Meetina completed <br />X <br />!Meetings conducted annually prior to the SWPPP submittal <br />Date of meeting <br />May 28 2013 <br />2c -1 Consider Public Input <br />Number of-comments I X I lAnnual <br />2d -1 Public Outreach <br />1 Earth Day <br />Celebration com fete /n <br />I X <br />I <br />ICurrently in place and will continue. Annually solicit and develop new materials <br />Number of participants <br />500 <br />This celebration was held at Harriet Alexander Nature Center. Where old city <br />ire cycling bins were dropped off for reusetrec clin . <br />2 <br />Spring Clean up Day <br />Spring Cleanup Day completed (y /n) <br />377 vehicles brought in <br />mater drop off <br />X <br />Currently in place and will continue: Summary of material dropped off: Mixed Solid <br />Waste (MSW) 12.13 ton, Construction Demolition Debris (C &D) 12.58 ton, Metals <br />8.18 ton, Batteries 15, Tires 33, Appliances 2 ton, Small Engines included in scrap, <br />Electronics 5 ton, concrete 1 ton, Carpet 0.55 ton <br />3 "Adopt-a- Park" Program I Number of parks adopted 1 28 1 1 ICurrently in place and will continue <br />4 <br />Storm Drain Stenciling <br />Program <br />Number of volunteer projects completed <br />0 <br />x <br />Currently in place and will continue- No volunteers this year <br />5 <br />Lake Monitoring <br />List of lakes monitored <br />Lake Josephine; Lake <br />McCarrons; Lake <br />Owasso; Bennett Lake; <br />Willow Pond <br />X <br />Currently in place and will continue - visual periodic inspections. <br />Page 2 of 5 <br />