Laserfiche WebLink
<br />A. That the security fence, bituminous surfacing, and <br />concrete curb and gutter for the front parking lot, and <br />the landscaping in front of the building be completed in <br />1993. <br /> <br />B. That the bituminous surface and curb and gutter <br />improvements to the rear parking lot, together with the <br />remaining landscaping be completed in 1994. <br /> <br />c. That modifications to the building, removing the metal <br />panels and replacing them with stucco, be completed by <br />December 31, 1997. <br />