Laserfiche WebLink
<br /> <br /> <br />Package A involves park buildings, shelters and related site work. <br /> <br />Structures will be demolished and rebuilt at Lexington, Villa, Sandcastle, Oasis, <br />o <br />Autumn Grove and Rosebrook Parks. <br /> <br />Central Park Shelters (FORParks, Victoria Ballfields and Foundation) will be <br />o <br />remodeled rather than rebuilt. <br /> <br />We will not be replacing the Central Park @ Lexington restrooms and redesigning <br />o <br />the park entrance at this time. <br /> <br />We will not be installing a splash pad at this time. <br />o <br /> <br />Sandcastle Park parking lot will not be relocated at this time. <br />o <br /> <br /> <br />Package B – Skating Center Repairs <br /> <br />Turns out, this was an odd package that combined painting work, rebuild of the <br />o <br />signature arch and addressing the banquet facility north entrance. No proposals <br />were received. Staff are working to collect separate quotes for the work. Details <br />should be worked out in the coming weeks. This package is not going to the <br />th <br />Council on May 12. <br /> <br /> <br />Package C – Harriett Alexander Nature Center <br /> <br />Project includes upgrades to mechanical and electrical systems as well as repairs <br />o <br />and improvements to building exterior and interior spaces. (Boardwalk is also being <br />replaced, this is part of package D). Staff and contractors are working on the timing <br />of projects so as not to impact programs and events. Outside work will be done in <br />the spring with interior work taking place fall and early winter. Staff will also be <br />working with Blue Rhino’s creative team to include the FORParks/FORHANC <br />display additions during the interior work timeframe. <br /> <br /> <br />Package D – Bridges & Boardwalk <br /> <br />Includes 3 bridges in Villa Park and the Nature Center Boardwalk. <br />o <br /> <br /> <br />Package E – Lighting <br /> <br />Includes Rink, court and Lake Bennett Pedestrian Lighting. <br />o <br /> <br /> <br />Package F – Court Resurfacing & Reconstruction <br /> <br />Designated Tennis and Basketball Courts will be worked on. The recommended <br />o <br />proposal includes a value added component that leaves the milled surface in place <br />for the overlay. This process has proven to help minimize court cracking. <br /> <br /> <br />Package G – Field Improvements <br /> <br />Includes work at the Legion Field, Evergreen Fields and Victoria Ballfields <br />o <br /> <br /> <br />Package H – Irrigation <br /> <br />Projects will involve upgrading to a 2-wire system that will allow for staff to <br />o <br />remotely operate the system. Additional irrigation will be added to Autumn Grove <br />Park to support heavy field use by youth recreation programs. <br /> <br /> <br />Package I – Natural Resources <br /> <br />The Natural Resource package includes both core projects and other projects. It is <br />o <br />the intent of the accepted proposal to be able to address all using the Renewal <br />Program budget and outside grants. Simply put the natural Resource package <br />removes invasives and restores these areas. The package includes a specific <br />maintenance agreement that will allow staff to develop a solid future program for <br />maintenance. The program also includes educational signage and the managed use <br />of volunteers to complete projects. The Natural Resource program will touch nearly <br />all areas of the City (22 of 30 parks). <br /> <br /> <br />Package J – Disc Golf Improvements <br /> <br />Work includes assessing design and performing improvements throughout the <br />o <br />course. <br /> <br /> <br />