Laserfiche WebLink
<br />Former Lexington School <br />STS Project #95192-XF <br /> <br />CONCLUSIONS/RECOMMENDA TIONS <br /> <br />Tank removal activities at the former Lexington School occurred on May 2, 1991. Petroleum <br />impacted soils were not identified during the removal. No groundwater was encountered in <br />the excavation. Soil samples collected from the base of the tank excavation and analyzed <br />- for petroleum constituents showed no results above MPCA action guidelines. <br /> <br />The tank was disposed of at Petro Tank Service's yard by cleaning, cutting and selling the <br />metal as scrap. The excavation was backfil1ed and compacted and the site was reconstructed <br />to conform generally with the conditions prior to excavation. <br /> <br />- 7 - <br />