My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02570
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2500
>
pf_02570
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 11:56:57 AM
Creation date
12/8/2004 11:49:40 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2570
Planning Files - Type
Planning-Other
Address
1130 COUNTY ROAD B W
Applicant
BRUCE RUSSELL PARK/CITY OF
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />J <br />J <br />] <br />J <br />J <br /> <br />]~ <br /> <br />]1 <br />]1 <br />]1 <br />JI <br />~I <br />JI <br />JI <br />~I <br />11 <br /> <br />Lexington School <br />STS Proposal P-2644 <br /> <br />COST ESTIMATE <br /> <br />We intend to provide the engineering services to the Roseville School District on a reim- <br />bursable basis consistent with the STS Consultants, Ltd. Fee School. Monthly invoices <br />reflect only the actual hours and associated fees invoiced with perfonning these services. <br />The environmental impainnent insurance surcharge wilI also be included. This insurance <br />surcharge wilI pennit STS to provide $1,000,000 in environmental impainnent insurance <br />applicable to STS errors or negligent acts or omissions. <br /> <br />The following is a cost estimate for perfonning the scope of work as defined in this pro- <br />posal. If petroleum impacted soils are encountered beyond approximately 20 cubic yards, <br />additional engineering fees can be expected. <br /> <br />Bid Specifications for Tank Removal <br /> <br />Principal Engineer, 0.5 to 1.0 hours @ $95.00/hr. <br />Senior Project Engineer, 2 to 3 hours @ $82.00/hr. <br />Environmental Geologist, 8 to 10 hours @ $54.00/hr. <br />CAD Draftsman, I to 2 hours @ $45.00/hr. <br />Secretary, 2 to 3 hours @ $33.00/hr. <br /> <br />$ 47.50 - $ 95.00 <br />$ 164.00 - $ 246.00 <br />$ 432.00 - $ 540.00 <br />$ 45.00 - $ 90.00 <br />$ 66.00 - $ 99.00 <br />$ 754.50 - $1,070.00 <br /> <br />Subtotal <br /> <br />Site Observation and Testing for Tank Removal <br /> <br />Senior Project Engineer, 0.5 to 1.0 hours @ $82:00/hr. <br />Senior Technician, 6 to 8 hours @ $34.00/hr. <br />Chemical testing, 2 samples @ $150.00/sample <br />HNU rental, 1 day @ $120.00/day <br /> <br />$ 41.00 - $ 82.00 <br />$ 204.00 - $ 272.00 <br />$ 300.00 - $ 300.00 <br />$ 120.00 - $ 120.00 <br />$ 631.00-$ 740.00 <br /> <br />Subtotal <br /> <br />Closure Documentation Report <br /> <br />Principal Engineer, 0.5 to 1.0 hour @ $95.00/hr. <br />Senior Project Engineer, 1 to 2 hours @ $82.00/hr. <br />Environmental Geologist, 8 to 10 hours @ $54.00/hr. <br /> <br />$ 47.50 - $ 95.00 <br />$ 82.00 - $ 164.00 <br />$ 432.00 - $ 540.00 <br /> <br />- 6 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.