Laserfiche WebLink
<br />Letter of Agreement for Oty of Roseville <br /> <br />18 April 1994 <br /> <br />Page 2 <br /> <br />ADDmONAL SERVICES <br /> <br />The following services are not included in the basic services outlined above. These will be additional services <br />and will be provided if authorized in writing. <br /> <br />1. Conduct an on-site inspection of the installed landscape materials and prepare a punch list The cost for <br />this will be a flat fee of $250.00. <br /> <br />2. Prepare inigation plans and specifications. <br /> <br />3. Attend preconstruction meeting. <br /> <br />4. Prepare additional construction observation reports for work pertinent to the landscape improvements. <br /> <br />5. Revisions to the site plan that significantly change the design intent, form and cost <br /> <br />6. Permit applications. <br /> <br />7. Colored renderings. <br /> <br />8. Presentations to neighborhood groups, City Commissions, and City Councils. <br /> <br />INFORMATION TO BE F1JRNISHED BY THE CITY <br /> <br />1. Survey information for locating proposed fence and relationship to property lines. <br /> <br />2. Existing grading on site along with locations of all underground utilities. <br /> <br />COST OF SERVICES <br /> <br />The cost for our basic services will be billed by the hour and will not exceed Three Thousand Eight Hundred <br />Dollars ($3,800.00). Unless otherwise noted, compensation for additional services will be on a <br />time-plus-materials basis in accordance with the attached Standard Rate Schedule. <br /> <br />All costs incurred will be payable to the DSU upon receipt of an invoice showing the work completed and the cost <br />of said work. To ead1 invoice not paid within thirty (30) days shall be added a service charge of one and onc-half <br />percent (1.5 percent) per month for each month delinquent. <br /> <br />TERMINATION <br /> <br />This agreement may be terminated upon written notice by either party. In the event of termination, the City shall <br />pay the DSU for the work completed on a time-plus-materials basis. <br />