My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2014_0522
Roseville
>
City Council
>
City Council Meeting Minutes
>
201x
>
2014
>
CC_Minutes_2014_0522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2014 12:41:40 PM
Creation date
6/10/2014 12:41:26 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
5/22/2014
Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special City Council Meeting <br /> Thursday,May 22, 2014 <br /> Page 4 <br /> accomplish. Mr. Schwartz advised that this frequently required staff- from engi- <br /> neering technicians to himself— to interrupt their tasks to address those customer <br /> service needs, especially as proven over the last year with storm damages and <br /> winter weather issues. <br /> Mr. Schwartz noted that the Finance Department had also indicated some addi- <br /> tional customer service needs, and proposed that this position, while housed in the <br /> Public Works Department in the lower level of City Hall, could be shared with <br /> Finance and/or other areas as applicable and as time allowed. However, Mr. <br /> Schwartz proposed that the position be funded from utility enterprise funds (e.g. <br /> water, sewer and Stormsewer). <br /> Inflationary/Contractual Costs <br /> While these areas are not significant, Mr. Schwartz projected that they would ex- <br /> ceed an inflationary increase, especially in the snow and ice program due to the <br /> City's depletion of reserves of those materials. However, Mr. Schwartz advised <br /> that he had just received the state bid pricing for 2015, and fortunately, the in- <br /> crease was not as significant beyond inflationary as originally anticipated. <br /> Mr. Schwartz advised that, as the economy continues to improve, contractual <br /> costs were increasing from contractors who'd held those costs fairly flat for a <br /> number of years, as they tried to recover. Therefore, Mr. Schwartz advised that <br /> costs were being seen that were larger than typical inflationary costs and over an- <br /> ticipated projections. <br /> Future Budget Challenges <br /> Mr. Schwartz reviewed future challenges, as detailed in the department handout, <br /> noting that costs would continue to increase as staff attempted to provide a higher <br /> level of services and improve efficiencies. Some of those challenges included the <br /> mandated MS4 requirements adopted by watershed districts to address long-term <br /> climate changes and design of storm water facilities beyond the capacity of the <br /> current storm system designed in the 1960's compared to today's new standards. <br /> Mr. Schwartz noted that stormwater facilities would need upgrading and provide <br /> flood control measures in future permits, also requiring modification of the City's <br /> system based on those higher standards. <br /> Mr. Schwartz noted that with that growth in services, the City was getting over <br /> the "bubble" in the life cycle of its streets, many built in the late 1980's and <br /> 1990's, requiring increasing maintenance and long-term infrastructure funding for <br /> the Pavement Management Plan(PMP). <br /> Also, Mr. Schwartz noted increasing lack of storage in the current Public Works <br /> facility, and the need to start thinking long-term for additional storage of materials <br /> and equipment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.