My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02600
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2600
>
pf_02600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 11:58:14 AM
Creation date
12/8/2004 12:11:58 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2600
Planning Files - Type
Variance
Address
1743 COUNTY ROAD C W
Applicant
MINNESOTA COACHES
PIN
042923430006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Two-Hour Fire Rated Fuel System <br /> <br />Specifications <br /> <br />Single Product - Bottom Load <br />Bullet Proof - Thermo Tank With Pad <br /> <br />10,000 gallon 1/4" steel UL 142 product tank 91 x 211 (capacity ± 3%) <br />3/16" exterior containment tank - 916" x 221 <br />81 X 251611 tank support and skid system <br />Overall dimensions 120"H x 114"W x 2516"L (excluding working vent) <br /> <br />FACTORY ASSEMBLED SYSTEM INCLUDES: <br /> <br />1 3" thermal ceramic two hour fire rated lining tested per UL 1709 <br />1 20 gallon weather tight spill container with drain valve and lockable cover per <br />NFPA 30 2~3.3.1 <br />1 3" bottom load fitting with check valve, gate valve, and locking cap per NFPA 303-7 <br />1 3" x 20 mesh removable fuel strainer in bottom load fill system <br />1 Non-electrical shut-off valve (inside tank) to conform to NFPA 30 2-1 O(c) <br />1 Stage I vapor recovery system with locking cover <br />1 Siphon supply line <br />1 Fire rated interstitial tank monitoring gauge per UL 1709 <br />1 Emergency vent to conform to NFPA 30 2-3.5 <br />1 Manway to product tankwith 4" access nipple <br />1 Product tank emergency venUo conform to NFPA 30 2-3.5 <br />1 Interstitial emergency vent to conform with Underwriters Laboratories <br />1 3" pressurejvacuum wor¡king vent to conform to NFPA 30 2-3.4.2 <br />1 Fusible link fire valve as required by UFC 79.904;(e)2 <br />1 Explosion prooJ4'~olenoid valveattank as -required by NFPA 30A 2-1.7 <br />1 Explosion proofflexible'supply·line to pump per NFPA 303-1 <br />1 ge"x4aILK711"l~,~gn.t§.ip,qu:U)t.chamb8r under pump per NFP A 30A 4-2.1 <br />1 12" x 15" lockable access hatch to containment chamber per NFPA 303-4.2 <br />1 External product level gauge <br />1 1/2" interstitial vacuum test port to conform with NFPA 30 2-8.3.1 <br />1 Interstitial access coupling at top end of tank per Underwriters Labor.atories <br />2 Lifting lugs , <br />1 20 B:C fire extinguisher as required by UFC 79.908 <br />Wired for selected dispensing system to conform with Ch. 5, <br />Art. 500, NFPA 70 (if installed) <br />Primed with high solids epoxy enamel <br />Painted with 86% reflective polyurethane Amershield paint <br />Labeled as required <br /> <br />2/93 <br /> <br />6.10 <br /> <br />"-------_._- .. .".~^- ,.----.----.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.