Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: June 24, 2014 Item No: 4 <br />Item Description: Communication Items <br />Projects update: <br />• 2014 Sanitary Sewer Lining Project— This project is about 75 % complete. Work remains <br />on Midlothian Lane, Haddington Road, Eldridge Ave, Skillman Ave and Larpenteur Ave. <br />All of these segments are also included in resurfacing projects so the sewer lining work <br />has to coordinate with those projects. Work should be complete by the end of July. <br />• County Road B -2 Sidewalk Construction — This project consists of constructing a 6 foot <br />sidewalk along the north side of County Road B2 from Lexington Ave to Rice Street as <br />well as along Victoria Street from County Road B2 north to County Road C. Work is <br />underway on this project with tree and brush removal ongoing. Utility work is <br />progressing now along with general excavation for the sidewalk in sections, starting from <br />the west and moving east. The sidewalk will be complete before the start of school with <br />some restoration and other minor work occurring after that. <br />• 2014 PMP- This project is well underway. The work along Ridgewood Lane and <br />Oakcrest Ave is complete. Milling and paving operations for the other segments will <br />occur in July. Most of the work to date has been focused on utility work including the <br />replacement of the water main along County Road B and Haddington Road by the <br />method of pipe bursting. Other utility work, including directional boring a new water <br />main section along Rice Street north of Larpenteur and replacing a piece of sanitary <br />sewer along Skillman Ave west of Prior, will also occur in late June or July. Finally, the <br />City is installing some substantial storm water retention and treatment devices in the <br />northwest corner of the City (Stanbridge St and Manson St) and at Dellwood St and <br />Sherren St behind the Roseville library to address some historic drainage issues. <br />• Snelling Ave Bus Rapid Transit: No news to report on this project. Final design is <br />underway and we still expect construction to begin in 2015 with service beginning at the <br />end of 2015. <br />• 2014 Seal Coat Project: The seal coat was applied last week and final sweeping is <br />underway (if not already complete). We will continue to monitor the areas and sweep as <br />needed if loose rock begins to develop. <br />• On Monday, June 16"', the City Council approved the purchase of several pieces of land <br />in the Twin Lakes area for the purpose of extending Twin Lakes Pkwy ultimately to <br />Fairview Ave. The City had received just under $1 million in federal funds for this <br />acquisition. This purchase completes almost all of the necessary right -of -way in order to <br />construct Twin Lakes Parkway. At this time, staff expects to be under construction for the <br />extension of Twin Lakes Parkway in 2015. This will likely be driven by some new <br />development in the area in the coming months. <br />