Laserfiche WebLink
<br />~ <br /> <br />Any Existing Grading/Drainage/Erosion Concerns ? <br />NO <br />YES <br /> <br />x <br /> <br />_A study of the existing storm sewer system needs to be <br />done to make sure the additional runoff can be handled. <br />-If the amount of runoff can be kept to existing runoff <br />-the existing system can handle it. <br /> <br />-- <br /> <br />Drainage Facilities Existing TO Be Built <br />Storm Sewer Main <br />Ponding Area <br />Catch Basins <br /> <br />Describe Grading/Drainage/Erosion control plan: _At the time of new <br />utility construction care must be taken to keep erosion out of the existing <br />sewer system. <br /> <br />Any Utility Concerns? NO <br /> <br />YES X <br /> <br />-- <br /> <br />Utility Facilities Existing To Be Built <br />Water Main X <br />Water Service X <br />Sanitary Sewer Main X <br />Sanitary Sewer Servo X <br /> <br />Describe Utility Service Plans: <br /> <br />See plan.. <br /> <br />Any Curb and Gutter to be Removed? <br /> <br />NO <br /> <br />YES X <br /> <br />-- <br /> <br />Any Road/Parking Facilities Concerns? <br /> <br />NO X YES <br /> <br />-- <br /> <br />Describe Road/Parking lots to be built: <br /> <br />page 2 <br />