Laserfiche WebLink
<br />stipulation in the amended PUD to allow for this two family <br />driveway). <br /> <br />b. Roseville's standards for utilities and street construction must be <br />followed. <br /> <br />c. Removal of the concrete curb and gutter on Grandview must be <br />done as per Roseville standards. <br /> <br />d. The new water services on the existing watermain in Grandview <br />must be tapped by Roseville's Utility Department. The street <br />repair must meet Roseville's standards. The contractor is required <br />to take out the needed permits at City Hall for this work. <br /> <br />e. The location of the proposed new catch basins on Lovell Lane <br />South will have to meet Engineering Department standards. <br /> <br />f The existing cul-de-sac at the end of Lovell Avenue does not meet <br />City standards. Snow storage is very short in the existing cul-de- <br />sac. A study to enlarge the driving area must be done at this time. <br /> <br />g. The plans must show the service locations. <br /> <br />h All deferred assessments must be paid. <br /> <br />I. Previously approved landscaping plans to be extended to the 8 <br />units. <br /> <br />Staff Report by: Michael Falk <br /> <br />6 <br />