Laserfiche WebLink
<br />8.0 - PLANNED UNIT DEVELOPMENTS (PUD's) <br /> <br />8.1 Types of PUD's Permissible <br /> <br />Planned unit developments (PUD's) are allowed for new projects on <br />undeveloped land, redevelopment of previously buil t sites, or <br />conversions of existing buildings and land. The land use districts <br />in which they are an allowable use are identified in the land use <br />district descriptions in section 4.2 of this ordinance and the <br />official zoning map. <br /> <br />8.2 Processing of PUD's <br /> <br />Planned unit developments must be processed as a conditional use, <br />except that an expansion to an existing commercial PUD involving 6 <br />or less new dwelling units or sites since the date this ordinance <br />was adopted is permissible as a permitted use provided the total <br />project density does not exceed the allowable densities calculated <br />in the proj ect density evaluation procedures in section 8.5. <br />Approval cannot occur until the environmental review process <br />(EAW/ErS) is complete. <br /> <br />8.3 Application for a PUD <br /> <br />The applicant for a PUD must submit the following documents prior <br />to final action being taken on the application request: <br /> <br />8.31 A site plan and/or plat for the project showing locations of <br />property boundaries, surface water features, existing and proposed <br />structures and other facilities, land alterations, sewage treatment <br />and water supply systems (where public systems will not be <br />provided), and topographic contours at ten-foot intervals or less. <br />When a PUD is a combined commercial and residential development, <br />the site plan and/or plat must indicate and distinguish which <br />buildings and portions of the project are residential, commercial, <br />or a combination of the two. <br /> <br />8.32 A property owners association agreement (for residential <br />PUD'S) with mandatory membership, and all in accordance with the <br />requirements of section 8.6 of this ordinance. <br /> <br />8.33 Deed restrictions, covenants, permanent easements or other <br />instruments that: 1) properly address future vegetative and <br />topographic alterations, construct ion 0 f additional buildings, <br />beaching of watercraft, and construction of commercial buildings in <br />residential PUD's; and 2) ensure the long-term preservation and <br />maintenance of open space in accordance with the criteria and <br />analysis specified in Section 8.6 of this ordinance. <br /> <br />8.34 When necessary, a master plan/drawing describing the project <br />and the floor plan for all commercial structures to be occupied. <br /> <br />8.35 Those additional documents as requested by the <br />C , D, b. (designate.] offlö1áJ.jboay) that are necessary <br />to explain how the PUD will be designed and will function. <br /> <br />P).. -¡ <br />