My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02696
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2600
>
pf_02696
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:04:53 PM
Creation date
12/8/2004 12:15:12 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2696
Planning Files - Type
Planning-Other
Address
2720 FAIRVIEW AVE N
Applicant
ONECOMM CORPORATION
Status
APPROVED
PIN
042923430002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />6.Ø Right of Way Access <br /> <br />6.1 Before commencing construction of its private <br />communications system in, above, over, under, across, <br />through or in any way connected with the streets, public <br />ways or public places of the City/County, the Permittee <br />shall first obtain the written approval of, and all <br />other necessary permits from, all appropriate <br />City/County agencies, including, but not limited to, the <br />Zoning department and department of Public Works. <br />Applications for such approval shall be made in the form <br />prescribed by the Engineering department. <br /> <br />6.2 Upon obtaining such written approval, the Permittee <br />shall give the Engineering department and any other <br />appropriate agency written notice within a reasonable <br />time of proposed construction, but in no event shall <br />such notice be given less than ten ClØ) days before such <br />commencement, except for emergency repairs of existing <br />lines or cables. <br /> <br />6.3 Any person who submits a request for a permit in <br />accordance herewith shall include therein proposed <br />agreements for the use of existing utility poles and <br />conduits, if applicable, with the owner(s) of such <br />facilities to be used or affected by the construction of <br />the proposed private communications system. These <br />agreemenbs shall become effective on the date of <br />execution of the permit issued in accordance herewith in <br />the event that such person is issued a permit. <br /> <br />In the event that permission to use existing poles or <br />conduits cannot be obtained, the Permittee shall submit <br />documentation to support the unavailability of existing <br />poles and a detailed plan for construction insuring <br />protection for existing facilities. <br /> <br />Nothing in this article or any permit issued in <br />accordance herewith, shall be construed as authorizing <br />the Permittee to erect and maintain new poles in areas <br />serviced by existing poles, if the poles are available <br />for the Permittee's use. The Permittee shall obtain <br />written approval from the Engineering department and <br />other appropriate City/County agencies before erecting <br />any new poles or installation of any underground <br />conduits where none exist. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.